File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
04510268 |
INCOMPLETED APPLICATION |
PERMISSION |
|
10/02/2004 Tuesday |
Peter & Sarah Baker |
Cloughjordan House Cloughjordan Co. Tipperary |
Demolition of disused slatted shed and change of use from agricultural stone outbuildings to two self-contained two bedroomed apartments, one office unit, and a home office/storage space, with a new treatment system, landscaping, car parking, reused vehicular entrance and all ancillary works |
04511649 |
APPLICATION FINALISED |
PERMISSION |
C |
01/11/2004 Monday |
Sustainable Projects Ireland Ltd. |
Oxpark and Townfields Cloughjordan |
The creation of a sustainable community. The development will comprise of demolition of the former Lime Tree pub and outbuildings on Main Street and the installation of site infrastructure for 133 mixed residential units and the site services for other associated buildings totalling 1250 q. m., with access from the Main Street and from the Step Road, including roads, public lighting, foul sewer, storm sewer, urine sewer and storage tanks, sludge drying facility and waste water treatment facilities requiring a waste management permit and a license for discharge of sewage effluent |
04511650 |
APPLICATION FINALISED |
OUTLINE PERMISSION |
C |
01/11/2004 Monday |
Sustainable Projects Ireland Ltd |
Oxpark & Townfields Cloughjordan
|
creation of sustainable community. The development will compromise demolition of the former Lime Tree Pub & outbuildings on Main St & construct 133 homes ( includ 20 live-work units) in the form of apartment, terrace, semi-det & det house types. The buildings vary in height from one to three storeys. There will be two community buildings (950 sq. m at 1 - 2 storeys), farm and maintenance buildings (150 sq.m) & craft/enterprise/maintenance building (150 sq.m). Access is by a new street (formed by the demolition of Lime Tree Pub & outbuildings, including barn on main street) & by an upgraded entrance on Step Rd. Landscaping will include relocation of the present field drain and its restoration as a stream ( as a natural water feature), sustainable urban drainage strategies for storm water attenuation, extensive native landscaping. Community outdoor spaces will be provided. The development will include approx. 25 acres of organic farm. |
06510359 |
APPLICATION FINALISED |
OUTLINE PERMISSION |
C |
24/03/2006 Friday |
Sustainable Projects Ireland Ltd., |
Oxpark and Townfields Cloughjordan |
4 no. town houses/live-work units at the entrance to, and within the confines of the new sustainable community (granted outline planning 04/51/1650. This applic. would constitute an alter. to the above ref. grant. The development will consist of 4 no. three bedroom terraced houses of two and a half storeys high each, with an access arch at ground floor level to a neighbouring property. The development will be accessed from the new main street of the sustainable community. Wastewater and other services will also be provided by the sustainable community under planning grant ref. above and by the associated grant 04/51/1649 for planning for infrastructure. 4 no. parking spaces will be provided. This application forms part of a re-arrangement of the entrance to the sustainable community |
07510932 |
APPLICATION FINALISED |
PERMISSION |
C |
08/06/2007 Friday |
Eco Partners |
The Clough Inn Main Street Cloughjordan |
development will consist of partly demolishing and renovating the existing buildings behind the pub to be used for new toilet, kitchen and storage facilities, enclosing a beer garden area to the rear, extending the function room to provide a new bar staff and off licence and installing new doors for the office licence in the arch next to the existing front doors of the pub |
08510063 |
INCOMPLETED APPLICATION |
PERMISSION |
|
30/01/2008 Wednesday |
Sustainable Projects Ireland Ltd. |
Oxpark Cloughjordan Co. Tipperary |
construct (1) a single storey building 213.43m sq. containing a woodchip boiler and a wood chip storage area (2) to construct a 2481 m sq. solar park, entrance off existing estate road as previously granted under planning application no., 04/51/1649 and associated site works |
08510137 |
INCOMPLETED APPLICATION |
PERMISSION |
|
15/02/2008 Friday |
Sustainable Projects Ireland Ltd |
Oxpark & Townsfields Cloughjordan Co. Tipperary |
construction of 2 no. detached houses on the site of the proposed eco-village. Development will consist of 2 no. detached storey & a half houses ( plots nos 2 & 3), accessed from the new street network of the sustainable community |
08510138 |
INCOMPLETED APPLICATION |
PERMISSION CONSEQUENT |
|
15/02/2008 Friday |
Sustainable Projects Ireland Ltd. |
Oxpark & Townfields Cloughjordan Co. Tipperary |
1 no. detached 2 and a half storey house (plot 1); 2 no. two and a half storey semi-detached houses (plot 102 & 103); 1 no. block of 2 storey terraced houses containing 3 no. dwelling units (plot 23, 24, 25) with one dwelling having residential attic space (Plot 25); 1 no. block of 2 storey terraced houses containing 3 no. dwelling units (Plot 20, 21, 22) with one dwelling unit over a basement (Plot 22). The development will be accessed from the new street network of the sustainable community. (Outline Ref. No. 04/51/1650). |
08510306 |
APPLICATION FINALISED |
PERMISSION |
C |
20/03/2008 Thursday |
Sustainable Projects Ireland Ltd., |
Oxpark & Townfields Cloughjordan
|
construction of 2 no. detached houses on the site of the proposed eco-village. The development will consist of 2 no. detached storey and a half houses (Plot no.s 2 & 3). The Development will be accessed from the new street network of the sustainable community |
08510334 |
APPLICATION FINALISED |
PERMISSION FOR RETENTION |
C |
28/03/2008 Friday |
Sustainable Projects Ireland Ltd. |
Oxpark & Townfields Cloughjordan Co. Tipperary |
of variations to the infrastructural works as installed under permission ref. 04/51/1649 on site of the proposed eco-village |