Planning application details ref: 21113 Sligo CoCo

100%100% Complete (warning)

Planning Application: 21113 (Sligo CoCo)
File Number: 21113
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 01/04/2021 Decision Due Date: 26/05/2021
Validated Date: 01/04/2021 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Refused Decision Date: 26/05/2021
Leave to Appeal: Appeal Date: 28/06/2021
Commenced Date: Submissions By: 05/05/2021

Applicant Details

Applicant name: Natural Forces Renewable Energy Ltd.
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: development consisting of the construction of one wind turbine up to 5MW with overall tip height of up to 180m; Construct the wind turbine foundation, hard standing and assembly area; Provide a site entrance and an access track within the site; Construct an on-site 20kV substation and underground electrical cable; Install a 7.9km underground grid connection, which passes throught the following townlands: Rathbaun, Templehouse Demesne, Kilbrattan, Portinch, Emlaghnaghtan, Cartron (Percival), Cartron (Phibbs), Lecarrow, Carrowkeel, Cloonkeevy, Ballybrennan, connecting into the existing ESB Substation; and construct all associated site development and ancillary works. A Natura Impact Statement has been prepared with this planning application
Development Address: Templehouse, Rathbaun, Co. Sligo
Architect Name: Barry McGinn Location Key: RATHBAUN
Electoral Division: Planner: 06
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 26/05/2021 Manager Order: P233/21
Decision Type: Refused Number of Conditions: 2
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 10/07/2028
Decision Description: development consisting of the construction of one wind turbine up to 5MW with overall tip height of up to 180m; Construct the wind turbine foundation, hard standing and assembly area; Provide a site entrance and an access track within the site; Construct an on-site 20kV substation and underground electrical cable; Install a 7.9km underground grid connection, which passes throught the following townlands: Rathbaun, Templehouse Demesne, Kilbrattan, Portinch, Emlaghnaghtan, Cartron (Percival), Cartron (Phibbs), Lecarrow, Carrowkeel, Cloonkeevy, Ballybrennan, connecting into the existing ESB Substation; and construct all associated site development and ancillary works. A Natura Impact Statement has been prepared with this planning application

Appeal Details


Appeal Details
Notification Date: 28/06/2021 BP Reference #: ABP-310612-21
Appeal Type: APPLICANT File Forward Date:
Submission Due Date: 25/07/2021 Submission Sent Date: 21/07/2021
Appeal Decision: CONDITIONAL Decision Date: 11/07/2023
Withdrawn Date: Dismissed Date:
Reason: