for development consisting of the following works as part of the proposed internal refurbishment of the former Foundation Laboratory to comprise a 280 seat auditorium; (1) upgrading of existing internal courtyard facades within Block B with a composite panel finish, (2) construction of 2 no. steel staircases within the courtyard to enhance means of escape (3) enlarging existing plant overruns on the Block B roof and overclad with composite panels, and (4) erection of new rooftop plant associated with the new auditorium; together with associated site development works and connection into existing site services infrastructure
Development Address:
I.T. Sligo , Ash Lane, Ballinode, Sligo
Architect Name:
Gavin Phelan
Location Key:
BELLANODE (PART OF)
Electoral Division:
Planner:
05
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Commencement Notice validated on Building Control Management System (B.C.M.S.)
Decision
Decision Date:
30/10/2015
Manager Order:
P446/15
Decision Type:
Conditional
Number of Conditions:
2
Grant Date:
30/11/2015
Grant Managers Order #:
P446/15
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
29/11/2020
Decision Description:
for development consisting of the following works as part of the proposed internal refurbishment of the former Foundation Laboratory to comprise a 280 seat auditorium; (1) upgrading of existing internal courtyard facades within Block B with a composite panel finish, (2) construction of 2 no. steel staircases within the courtyard to enhance means of escape (3) enlarging existing plant overruns on the Block B roof and overclad with composite panels, and (4) erection of new rooftop plant associated with the new auditorium; together with associated site development works and connection into existing site services infrastructure
development which will consist of refurbishment and two storey extension (299 sqm) to the courtyard areas of the existing Technology Centre building (Block B) and recladding of the entire East Elevation of Block Bat Institute of Technology
development consisting of the construction of a new on-grade car park to accommodate 150 car spaces including site lighting, drainage and landscaping with a vehicular entrance off an existing access road within the site leading to Clarion Road, new opening formed in existing boundary wall for pedestrian access, replacing and upgrading of raised pedestrian crossing point from the new car park to the existing pedestrian entrance to the main campus on Clarion Road and the construction of an external platform lift at the existing pedestrian entrance for disabled access to the main campus building. The development is located on a site north of Clarion Road at the intersection with Barroe Road and is taking place within the curtilage of a Protected Structure at the Institute of Technology
development consisting of a new three storey extension to the south face of the existing Science Department at Block B and the construction of a new pedestrian access ramp and entrance canopy to the north entrance of Block D. The works will comprise of 4,272 sqm of additional accommodation on the footprint of an existing surface car park South of Block B, including a new 500-seat Canteen with associated Kitchens, laboratory space, offices and associated services for the expansion of the Science Faculty, a new Part M compliant pedestrian ramp from the Clarion Road and a new entrance canopy to the north of Block D. The works will include all associated site works / services and hard / soft landscaping at the Institute of Technology
construction of a new pedestrian and cyclist infrastructure comprising: (1) a new pedestrian access off Ash Lane; (2) interconnecting paths and road crossings within the main campus; (3) a new path from Clarion Road to Blocks K & L; (4) installation of covered cycle stands, bike lockers and cycle repair stations at various locations on campus and (5) associated site development works including signage
development consisting of (1) construction of a new boundary wall to lands fronting onto Ash Lane; (2) upgrading of existing boundary wall to lands fronting onto Ballytivnan Road; (3) form two new maintenance access points with footpath crossings to Ash Lane & Ballytivnan Road; (4) new pedestrian and cyclist infrastructure including new footpaths and the installation of covered cycle stands with external lockers and traffic calming / signage and (5) associated site development works including signage
No Environment Impact Assesments Associated with this Application