Alter, extend and refurbish the existing Aula Maxima Student Centre and re-align the existing roadway to the immediate south of the forementioned building, together with associated site works and services at
Development Address:
Institute of Technology, Ballinode, Sligo
Architect Name:
Enda McKiernan
Location Key:
BALLINODE
Electoral Division:
100
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
04/09/2008
Manager Order:
267/08
Decision Type:
Conditional
Number of Conditions:
4
Grant Date:
10/10/2008
Grant Managers Order #:
267/08
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
09/10/2013
Decision Description:
Alter, extend and refurbish the existing Aula Maxima Student Centre and re-align the existing roadway to the immediate south of the forementioned building, together with associated site works and services at
development which will consist of refurbishment and two storey extension (299 sqm) to the courtyard areas of the existing Technology Centre building (Block B) and recladding of the entire East Elevation of Block Bat Institute of Technology
development consisting of the construction of a new on-grade car park to accommodate 150 car spaces including site lighting, drainage and landscaping with a vehicular entrance off an existing access road within the site leading to Clarion Road, new opening formed in existing boundary wall for pedestrian access, replacing and upgrading of raised pedestrian crossing point from the new car park to the existing pedestrian entrance to the main campus on Clarion Road and the construction of an external platform lift at the existing pedestrian entrance for disabled access to the main campus building. The development is located on a site north of Clarion Road at the intersection with Barroe Road and is taking place within the curtilage of a Protected Structure at the Institute of Technology
construction of a new pedestrian and cyclist infrastructure comprising: (1) a new pedestrian access off Ash Lane, (2) interconnecting paths and road crossings within the main campus, (3) a new path from Clarion Road to Blocks K & L, (4) installation of covered cycle stands, bike lockers and cycle repair stations at various locations on campus and (5) associated site development works including signage
construction of a new pedestrian and cyclist infrastructure comprising: (1) a new pedestrian access off Ash Lane; (2) interconnecting paths and road crossings within the main campus; (3) a new path from Clarion Road to Blocks K & L; (4) installation of covered cycle stands, bike lockers and cycle repair stations at various locations on campus and (5) associated site development works including signage
development consisting of (1) construction of a new boundary wall to lands fronting onto Ash Lane; (2) upgrading of existing boundary wall to lands fronting onto Ballytivnan Road; (3) form two new maintenance access points with footpath crossings to Ash Lane & Ballytivnan Road; (4) new pedestrian and cyclist infrastructure including new footpaths and the installation of covered cycle stands with external lockers and traffic calming / signage and (5) associated site development works including signage
Institute of Technology Sligo Clarion Road Ballinode
internal and external refurbishment works to the School of Business and Social Studies consisting of (1) demolition of existing single storey classroom extension and single storey plant room to the north of Block D (2) raising the existing parapet height and recladding all elevations to Block D (3) construction of a new entrance canopy on the north facade of Block D (4) raising existing staircase to allow access to roof level of Block D (5) overcladding of existing rooftop plant rooms to Block D (6) enlarging existing gas compound to the west of Block D (7) construction of new external ramp outside Block C entrance and increasing the area of paved landscaping outside Block D, together with associated site development works, services and signage
No Environment Impact Assesments Associated with this Application