Planning application details ref: 1545 Roscommon County Council

100%100% Complete (warning)

Planning Application: 1545 (Roscommon County Council )
File Number: 1545
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 18/02/2015 Decision Due Date: 05/08/2015
Validated Date: 18/02/2015 Invalidated Date:
Further Info Requested: 02/04/2015 Further Info Received: 09/07/2015
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 31/07/2015
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By:

Applicant Details

Applicant name: Aurivo Dairy Ingredients,
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: The development will consist of the Installation of a Steam Turbine & Electricity Generator into an existing building. (Generator is part of the Renewable Energy Feed in Tariff promoted by the Irish Government to support industry in becoming more competitive through the simultaneous generation of heat and electricity (CHP = Combined Heat & Power) from a carbon neutral fuel such as wood chip biomass, installation of new switchgear & transformer, installation of a wood chip pre-drier with the existing fuel store, replace existing stack with new 50 meter stack and incorporating the exhaust from the biomass at
Development Address: Ballaghaderreen,, Co. Roscommon.
Architect Name: Location Key: BALLAGHADERREEN
Electoral Division: Boyle Rural Part of Planner: Ballaghaderreen
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 31/07/2015 Manager Order: PL 446/15
Decision Type: Conditional Number of Conditions: 2
Downloads a Microsoft Word Document (Document Size 18 Kb)

Download a Free Word viewer
Grant Date: 07/09/2015 Grant Managers Order #: PL446/15
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 06/09/2020
Decision Description: The development will consist of the Installation of a Steam Turbine & Electricity Generator into an existing building. (Generator is part of the Renewable Energy Feed in Tariff promoted by the Irish Government to support industry in becoming more competitive through the simultaneous generation of heat and electricity (CHP = Combined Heat & Power) from a carbon neutral fuel such as wood chip biomass, installation of new switchgear & transformer, installation of a wood chip pre-drier with the existing fuel store, replace existing stack with new 50 meter stack and incorporating the exhaust from the biomass at

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: