File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
001916 |
APPLICATION FINALISED |
PERMISSION |
C |
13/12/2000 Wednesday |
Joseph Fitzgerald |
Ballinphuill Townland, Castlerea, Co. Roscommon |
To demolish existing front porch, construction of new remedial room, form new front entrance door to front of School with extension to rear, new septic tank and percolation area and associated site works at |
071415 |
APPLICATION FINALISED |
PERMISSION |
C |
25/07/2007 Wednesday |
Canon Joseph Fitzgerald, Tarmon National School, |
Ballinphuill Td., Castlerea, Co. Roscommon. |
to construct an extension comprising of 1. A new classroom; 2. A staff room; 3. Toilets and a multipurpose room; 4. Gym sports hall; to an existing school, including all other ancillary site works at |
15402 |
APPLICATION FINALISED |
PERMISSION |
C |
21/12/2015 Monday |
Canon Joseph Fitzgerald, Board of Management, Tarmon National School |
Ballinphuill Td. and Termon Beg Td., Castlerea, Co. Roscommon. |
for (i) the construction of a 4 classroom single store extension to the side (western)elevation of the existing school (ii) the construction of a single storey entrance porch to the front (southern) elevation of the existing GP hall (iii) a new roadside entrance (iv) the provision of additional car parking, hard and soft play areas, sensory garden and astro turf pitch (v) the installation of a new sewerage treatment unit and percolation area, along with connections to all services and all other associated site works at |
19608 |
APPLICATION FINALISED |
RETENTION PERMISSION |
C |
21/11/2019 Thursday |
Fr John McManus |
Ballinphuill Td & Termon Beg Td Castlerea Co. Roscommon |
to retain and complete and Permission for the following; (1) Permission to retainand complete is sought for (I) changes to development previously granted under PD/15/402 including rearrangement of access road, parking, tarmac areas and raised footpath to school perimeter together with elevational changes to window treatment of new school block. (ii) changes to development previously granted under PD/14/256 including changes to the rear block now repurposed from changing rooms/storage to classrooms including elevational changes. (2) Permission is sought for new single storey ASD classroom block to rear of recently completed extension together with connections to services and all other associated site works at |
20257 |
APPLICATION FINALISED |
PERMISSION |
C |
07/07/2020 Tuesday |
Board of Management Tarmon N.S. |
Ballinphuill Townland & Termon Beg Townland Castlerea |
permission for the erection of 2 prefabricated temporary classroom buildings, including connections to all services and all other associated site works at |
21131 |
APPLICATION FINALISED |
PERMISSION |
C |
10/03/2021 Wednesday |
Board of Management Tarmon National School |
Tarmon National School Ballinphuill Td & Termon Beg Td Castlerea |
for the erection of floodlights to existing astro-turf pitch and lighting to illuminate existing running track, walkway and car-park, together with all associated site works at |
2353 |
APPLICATION FINALISED |
PERMISSION |
C |
24/02/2023 Friday |
The Board of Management of Tarmon National School |
Tarmon National School Ballinphuill Townland and Termon Beg Townland |
Retention Permission and Permission for the following: 1. Permission for Retention is sought for existing Temporary Car Park; 2. Permission is sought for the construction of single storey extension to the rear (north-east) of existing school consisting of 1 Classroom SEN Base, Early Intervention Classroom, Multisensory Room, 3 Mainstream Classrooms, Office, Storage Area & necessary circulation areas, demolition of existing storage areas, provision of additional car parking spaces, upgrading of foul and surface water treatment system, together with all associated site works at |
96486 |
APPLICATION FINALISED |
PERMISSION |
C |
11/07/1996 Thursday |
Kieran Dowd on behalf of Tarmon N.S. |
Ballinphuill Castlerea |
Erection of Extension to Tarmon National School |