training pitch and surrounding running track, including flood lighting lamps and stantions, also for all ancillary structures around pitch including, roofed substitute benches, ball stopping posts and nets and surrounding boundary fencing. In addition for boundary wall to northern boundary of main playing field, and flood lighting lamps and stations to same field, also, 1 no. materials storage shed located at northern elevation of dressing room building
permission to consist of 1. Removal of the existing roof, increasing the height of the building around the perimeter and fitting new roof structure and covering including a parapet. 2. A new two storey extension along the northern and western elevation and construction of a recessed viewing balcony at first floor to the southern elevation (overlooking football pitch). 3.Refurbishment of the exterior facades to include a cladded finish at first floor level. 4. Repositioning of the metal steps to the eastern elevation to facilitate access to the viewing balcony. 5. Internal alterations to the floor plan layouts. 6. All associated site works, hardstandings, drainage and finishes
No Environment Impact Assesments Associated with this Application