File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
24327 |
INCOMPLETED APPLICATION |
PERMISSION |
|
02/08/2024 Friday |
Loughglynn Developments Ltd |
Peterstown Trim Co Meath |
a 10 year planning permission for development of a Solar PV Panel Array consisting of up to 10,000 no. Solar PV Panels (c.27,010m2) on ground mounted steel frames on a c. 6.76 hectare site, ESB Substation, Power Inverter Units, Underground Cable Ducts, Perimeter Security Fence, CCTV Masts, Solar Lighting and all associated works |
24358 |
INCOMPLETED APPLICATION |
PERMISSION |
|
29/08/2024 Thursday |
Loughglynn Developments Ltd |
Peterstown Trim Co Meath |
a 10 year planning permission for development of a Solar PV Panel Array consisting of up to 10,000 no. Solar PV Panels (c.27,010m2) on ground mounted steel frames on a c. 6.76 hectare site, ESB Substation, Power Inverter Units, Underground Cable Ducts, Perimeter Security Fence, CCTV Masts, Solar Lighting and all associated works |
24383 |
FURTHER INFORMATION |
PERMISSION |
|
25/09/2024 Wednesday |
Loughglynn Developments Ltd |
Peterstown Trim Co. Meath |
a 10 year planning permission for development of a Solar PV Panel Array consisting of up to 10,000 no. Solar PV Panels (c.27,010m2) on ground mounted steel frames on a c. 6.76 hectare site, ESB Substation, Power Inverter Units, Underground Cable Ducts, Perimeter Security Fence, CCTV Masts, Solar Lighting and all associated works |
TA70364 |
APPLICATION FINALISED |
PERMISSION |
R |
20/07/2007 Friday |
Shannon Homes Newtown Ltd |
Blackfriary Trim Co Meath |
The development, on a 3.14 hectare site, will consist of the construction of 1 no. retail warehouse unit with mezzanine level and service yard (gross floor area 4680sq.m), 8 no. enterprise units in two storey building (total gross floor area 2,638sq.m), 2 no. car sales units with associated forecourts and car service areas (total gross floor area 1060sq.m), new vehicular access onto the Dunderry Road, pedestrian access onto Athboy Road, new junction onto Athboy Road (R154) and construction of length of new distributor road (length of approximately 140m, and width of approximately 10.5m) to serve the Blackfriary Local Area Plan lands and proposed development, connection to public foul sewerage system and public water supply, 421 no. car-parking areas, and all associated site development works above, at and below ground level, including landscaping and boundary treatments. The site is bounded by the Dunderry Road to the west, the Athboy Road (R154) to the south, and the proposed distributor road to serve the Blackfriary Local Area Plan lands to the east |
TA801561 |
INCOMPLETED APPLICATION |
PERMISSION |
|
16/05/2008 Friday |
Blackfriary Services Co Ltd |
Blackfriary & Peterstown Trim Co Meath |
the construction of a road of total overall linear length of approximately 1.54km and width of 17.8m, containing 2 traffic lanes with grass margins, footpaths, cycle tracks and junctions including roundabouts. The road connects Athboy Road (R154) with Navan Road (R161). The line of the road is broadly east of Athboy Road and west of Navan Road, Trim Co Meath, in the townlands of Blackfriary & Peterstown The development provides for foul and surface water drainage and watermain to accommodate future development of the adjacent lands and includes replacing of Newtown Foul pumping station with a new foul pumping station, storage facility and contrl building on an extension to the existing pumping station site on Newtown Road, Trim in the townland of Newtown. The development also provides for site development works associated with the road including surface water drainage, watermains, utilities, street lighting, road signage and markings. A traffic impact statement accompanies this application. A Framework plan extending to an area of 70.8 hectares also accompanies the planning application. The Framework plan, though not forming part of the planning application provides guidance on matters such as land use distribution, urban design, and provision of social, recreational, and community provision in accordance with the requirements of the Planning Application. The proposed road is in accordance with the contents of the Framework plan |