development will consist of a Minor Amendment to previously approved Data Centre Campus application (ref: RA/150605) comprising two elements: 1. a 16 sq metre illuminated entrance sign to the immediate north of the main Data Centre Kilbride Road entrance; and 2. a 3.5m high Weather Transmitter mounted on the roof of Datahall CLN-1.1, projecting 2m above the building's perimeter screen wall and associated works
Development Address:
Land Of Portan, Gunnocks & Clonee, Co. Meath
Architect Name:
Una Somerville
Location Key:
PORTAN & CLONEE
Electoral Division:
Incorrect Icl Voter Recor
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
14/06/2016
Manager Order:
R793/16
Decision Type:
Conditional
Number of Conditions:
1
Grant Date:
19/07/2016
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
18/07/2021
Decision Description:
development will consist of a Minor Amendment to previously approved Data Centre Campus application (ref: RA/150605) comprising two elements: 1. a 16 sq metre illuminated entrance sign to the immediate north of the main Data Centre Kilbride Road entrance; and 2. a 3.5m high Weather Transmitter mounted on the roof of Datahall CLN-1.1, projecting 2m above the building's perimeter screen wall and associated works
Lands at Loughsallagh to the north of Clonee Village, Co. Meath
the proposed development will consist of a retention application for a building already in existence on the datacentre campus. The building was previously used as temporary substation to help power the campus during construction stage. The site area is circa 0.04 Ha. The building has since been decommissioned and the applicant is applying for retention permission to retain the building for storage of landscaping materials and maintenance equipment. The building is two tiered with different heights. The building measures approximately 12.5 metres in length and has a height of 2.9 metres on the lower side of the tier and a height of 4.27 metres on the higher tier. The building has a width of 5.3 metres at both ends. The building being retained has an area of 69.5sq.m.
development on this site: Lands within the townlands of Portan, Gunnocks and Clonee, County Meath - site bounded to the south by the R147, to the west by the Kilbride Road, to the north by The Mayne and to the east by lands at Damastown Industrial Park. The development will consist of: Construction of a data centre campus in two phases within 10 years which consists of the following: In Phase 1: Construction of two data centre buildings containing 8 no. data halls with a gross floor area of 50,800 m2 and with a data capacity of 36MW per building (each building is 25,400 m2 and contains 4 no. data halls) together with associated mechanical and electrical spaces and parking. 1 No. single storey ancillary administration/office building with gross floor area of 6,424 m2 linking and accessing the data centre buildings. Ground-level emergency back-up generators (with internal fuel tanks). New site access and temporary construction access and car parking arrangements (including utilisation of existing farm access) off the Kilbride Road (L5028). Closure of existing accesses (following the demolition of 2no. residential units). Site infrastructure to include entrance gates and appropriate signage, security hut (36m2), internal roadways & footpaths, 217 car parking spaces in total across the site in both phases, bicycle shelter, a water sprinkler tank, pumping facilities, water tanks, drainage networks, attenuation ponds and a connection to the public sewer on the R147. Bridges and culverts over the Pace and Portan streams. Hard and soft landscaping. Demolition of two existing residential dwellings on Kilbride Road (L0528), 150 metres northeast of R147/L5028. Upgrade to L5028 Kilbride Road to provide cycle path and pedestrian footpath between the R147 and the proposed new site access. Installation of temporary electrical infrastructure to service the data centre campus before final connection. Ancillary site works including underground electricity 20kV cables between substation and data centres. There is a separate planning application and associated Environmental Impact Statement (EIS) on lands enclosed by the data centre application. It is a Strategic Infrastructure Development (SID) application to An Bord Pleanala under Section 182A of the Planning and Development Act 2000 (as amended). The application comprises the construction of a new 220 kV substation compound and associated loop-in connection to the existing .........
the proposed development will consist of an expansion of the existing approved data centre Campus (Meath County Council ref: RA/150605 / An Bord Pleanala ref: PL 17.245347) comprising the following elements (a) Construction of two single-storey data centre buildings with a gross floor area (GFA) of circa 57,400m2; (b) A single storey administration / office building with a GFA of circa 5,710m2 which is physically linked to the proposed data centre buildings; (c) Site infrastructure to include entrance gates and appropriate signage, a security guardhouse of circa 60m2 and associated canopy; (d) Road works including a new permanent site access, internal roadways, underpass & footpaths, circa 276 no. car parking spaces, bicycle parking facilities, upgrades to a section of the L5028 Kilbride Road together with an emergency access via the L10101 to include resurfacing only a section of the road and additional of circa 1 no. passing bay; (e) General drainage networks and arrangements and a connection to the existing public sewer network; (f) Surface level back-up generators with internal fuel tanks; (g) Hard & soft landscaping incorporating perimeter fencing to include both external and internal circa 3.0 metre high architecturally designed metal fencing and matching gates; (h) Temporary construction access and associated car parking arrangements off the Kilbride Road (L5028); and (i) Associated & ancillary site works. Planning permission is being sought for a 10 year period. The is a separate planning application and associated EIAR on lands enclosed by the data centre application. It is a Strategic Infrastructure Development (SID) application to An Bord Pleanala under S182A of the P&D Act 2000, as amended. The application comprises the construction of a new 220KV substation compound & assoc. underground 220KV cables connecting to the existing substation at Portan, Clonee(consented ABP ref PL17.VA0018). An Environmental Impact Assessment Report (EIAR) has been prepared for the proposed development and has been submitted with this application.
No Environment Impact Assesments Associated with this Application