File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
21624 |
APPLICATION FINALISED |
PERMISSION |
C |
07/04/2021 Wednesday |
FPS Film Production Solutions Limited |
Ashbourne Business Park Ashbourne Co. Meath |
amendment to planning permission Register Reference AA/180221, as further amended by Register Reference AA/200011, and Register Reference AA/201776 to (1) Demolish existing farmhouse and associated outbuildings; (2) Remove topsoil and lay a new surface of granular material; (3) The use of the area as a film studio back lot providing for the temporary erection of film sets and for outdoor shooting; (4) The provision of an access point from the site to the overall landholding, and all ancillary site services, including boundary treatments, landscaping, drainage and all site development works; (5) The proposed development does not include any alterations to the permitted development. The site area of the proposed development is 3.86 ha. The total area of the permitted and proposed development is 7.59ha. |
AA180221 |
APPLICATION FINALISED |
PERMISSION |
C |
09/03/2018 Friday |
FPS Film Production Solutions Ltd |
Ashbourne Business Park in the Townland of Killegland Ashbourne Co. Meath |
for (i) Film Studio Facility in 3 No. Blocks for the production of live action and animated film & television product, commercials, video games and all other media & multimedia products including computer generated imagery (CGI). The proposed development will include: A) Areas for film production and sound stages, editing and production spaces, film demonstration facilities and facilities for the rental of film making articles - all provided in buildings as follows: Block A: 5,119m2 (18.8m high, including 2 No. 69.4m2 Basement Areas to facilitate live action filming). Block B: 2,095m2 (18.8m high). Block C: 985m2 (15m high). B) Offices, resting, recreational & dining areas, make up rooms, workshops and film education & training areas, post production facilities, animation & CGI facilities, storage areas - all attached to the main buildings over 3 No. floors as follows: Block A: 1,602m2, Block B: 1,293m2, Block C: 209m2, Overall building area provided: 11,303m2. (ii) For the construction of site access & circulation from the exisitng estate's internal access road, footpaths, public lighting and parking facilities for the proposed development. (iii) For the occasional temporary erection of film sets within the curtilage of the proposed development if or when necessary. (iv) For the provision of foul sewer, surface water sewers and water mains including underground surface water attenuation facility. (v) And or in addition to the above, permission for the use of the said premises for warehousing/general light industrial uses. (vi) For all ancillary works and uses necessary for the above proposed developments such as landscaping, fencing, paving, utilities and services & all site development works |
AA201776 |
APPLICATION FINALISED |
PERMISSION |
C |
23/11/2020 Monday |
FPS Film Production Solutions Limited, |
Ashbourne Business Park Ashbourne Co Meath |
the development will consist of an amendment to planning permission Register Reference AA/180221, as amended by Register Reference Ref. AA/200011 to : (1) extend the site area to the northwest of the site for which film studios and other development was granted under the aforementioned permissions by 1.33 ha, extend the road network into this area, reconfigure the permitted internal road and car parking layout, and provide for 65 no. additional car parking spaces, increasing car parking from 225 no. spaces to 290 no. spaces, 136 no. bicycle parking spaces and providing 2 no. coach set down locations in the site (2) to provide for a film workshop building (Block D) of 6,958 m2, 13,855m in height with associated offices and support facilities, capable of subdivision with associated accesses, plant rooms and ancillary accommodation, which will also provide for film stages, including green screen stages and commercials shooting: (3) to provide for waste storage facilities to the rear of Block D; (4) for the occasional temporary erection of film sets within the curtilage of the extended site area and outdoor shooting, if necessary (5) and for genreal warehouse/light industrial use: (6) for the provision of all anciallary site services, including boundary treatments, landscaping, site attenuation and drainage, public lighting, footpaths and crossings and all site development works, (7) the proposed development does not include any alterations to the permitted Blocks A, B and C. The site area of the proposed development is 2.4 ha. The total area of the permitted and proposed development is 3.73 ha |