File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
231164 |
INCOMPLETED APPLICATION |
RETENTION PERMISSION |
|
22/12/2023 Friday |
Brian Smith, C/o The Violet Bottle Company Ltd, |
Puddenhill Moorepark Garristown, Co Meath |
a new entrance and driveway including the importation of materials for roads and change of ground levels. Conversion of ground floor restaurant area to a 5 bedroom Air B & B unit with bathroom, living, dining and kitchen area and conversion of 3 no. rooms to 2 no. staff bedrooms and linen store. Permission for the retention and completion of the conversion of the unused first floor area to 5 no. self catering, studio apartments. Retention of the amendment to 7 no. existing apartments. Retention of the removal of temporary bedrooms and the fitting of 11 no. short term stay rooms with communal kitchen, dining , toilets, shower and lounge at first floor level. Retention of the amendments to and upgrading of the elevations |
24299 |
INCOMPLETED APPLICATION |
PERMISSION |
|
12/07/2024 Friday |
Brian Smith, C/o The Violet Bottle Company Ltd |
Puddenhill Moorepark Garristown, Co Meath |
retention and completion of 3 no. buildings, Unit A: Two no. 3 bed family units, Unit B1: Five no. single bedrooms with dining/living, kitchen and shower area also one no. self-catering 3 bed family unit, Unit B2: Five no. single bedrooms with dining/living, kitchen and shower area, also one no. self-catering 3 bed family unit, all for short term letting, tourist accommodation including the repositioning of a 3 bed Managers staff accommodation unit to form a courtyard of accommodation. Planning permission to remove and decommission the existing waste water treatment system and replace same with a new secondary treatment system including a polishing filter |
24319 |
INCOMPLETED APPLICATION |
PERMISSION |
|
26/07/2024 Friday |
Brian Smith, C/o The Violet Bottle Company Ltd |
Puddenhill Moorepark Garristown, Co Meath |
retention and completion of 3 no. buildings, Unit A: Two no. 3 bed family units, Unit B1: Five no. single bedrooms with dining/living, kitchen and shower area also one no. self-catering 3 bed family unit, Unit B2: Five no. single bedrooms with dining/living, kitchen and shower area, also one no. self-catering 3 bed family unit, all for short term letting tourist accommodation. Planning permission for the repositioning of a 3 bed Managers staff accommodation unit to form a courtyard of accommodation including the removal and decommissioning of the existing waste water treatment system and the replacement of same with a new secondary treatment system including a polishing filter |
24336 |
APPLICATION FINALISED |
PERMISSION |
R |
08/08/2024 Thursday |
Brian Smith, C/o The Violet Bottle Company Ltd |
Puddenhill Moorepark Garristown, Co Meath |
1. retention and completion of 3 tourist accommodation buildings, Unit A: Two no. 3 bedroom family units, Unit B1: Five no. single bedrooms with dining/living, kitchen and shower area also one no. self-catering 3 bedroom family unit, Unit B2: Five no. single bedrooms with dining/living, kitchen and shower area, also one no. self-catering 3 bed family unit, all for short term letting tourist accommodation and a separate 3 bedroom Managers staff accommodation unit. 2. Planning permission for relocation and repositioning of the 3 bedroom Managers staff accommodation unit to form a traditional courtyard design style of tourism accommodation provision in keeping with the rural character of the area, removal and decommissioning of existing waste water treatment system and the replacement of same with a new secondary treatment system including a polishing filter |