(1) retention permission,:retention of existing toilet and washroom facilities in existing building for existing campsite use, (2) planning permission: permission for new effluent treatment system and percolation area to serve the existing toilet and washroom facilities, (3) change of use: change of use of lands to south of existing campsite from agriculture to campsite use
Development Address:
Drumsawry or Summerbank, Oldcastle, Co Meath
Architect Name:
Location Key:
DRUMSAWRY + SUNNYBANK
Electoral Division:
Incorrect Icl Voter Recor
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
29/07/2021
Manager Order:
1767/21
Decision Type:
Conditional
Number of Conditions:
10
Grant Date:
09/09/2021
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
08/09/2026
Decision Description:
(1) retention permission,:retention of existing toilet and washroom facilities in existing building for existing campsite use, (2) planning permission: permission for new effluent treatment system and percolation area to serve the existing toilet and washroom facilities, (3) change of use: change of use of lands to south of existing campsite from agriculture to campsite use
the development consists of and will consist of the following: Retention Permission for: 1) Existing dormer style log cabin operating as tourism accommodation ancillary to adjoining campsite, 2) Existing waste water treatment system, 3) Ancillary site works. Permission for: 1) To close up existing entrance and remove hardcore surfaced driveway serving the dormer style log cabin, 2) To use the existing entrance to the yurts area of the site along with internal gravelled roadway to access the log cabin building, 3) To carry out alterations to the existing log cabin to include the following: a) Remove front entrance lobby and storage area including cutting back of roof area over, b) Removal of balcony area on gable end, c) Cutting back and removal of large roof overhangs and log ends and the construction of an external block and rendered wall around the exterior of the cabin including alterations to window and door opes to the cabin, d) Upgrading of existing waste water treatment system and percolation area serving the existing log cabin and glamping yurts/camping area, e) All ancillary site works to include extensive landscaping to the north west of the site
retention permission for (1) Existing dormer style log cabin operating as tourism accommodation ancillary to the adjoining campsite (2) Waste water treatment unit and percolation area (3) All ancillary site works. Permission for (1) upgrade of existing waste water treatment unit and percolation area (2) To close up an existing entrance and remove hardcore surfaced driveway (3) To construct an outdoor recreational and arts room with covered patio area ancillary to the dormer style log cabin (4) To construct a rental bike storage shed adjacent to existing on site meeting room (5) To construct a covered out door wellness, sauna and hot tub area (6) To construct a barbeque hut type building (7) and all ancillary site works
retention permission for (1) Existing dormer style log cabin operating as tourism accommodation ancillary to the adjoining campsite (2) Waste water treatment unit and percolation area (3) All ancillary site works. Permission for (1) upgrade of existing waste water treatment unit and percolation area (2) To close up an existing entrance and remove hardcore surfaced driveway (3) To construct an outdoor recreational and arts room with covered patio area ancillary to the dormer style log cabin (4) To construct a rental bike storage shed adjacent to existing on site meeting room (5) To construct a covered out door wellness, sauna and hot tub area (6) To construct a barbeque hut type building (7) and all ancillary site works
retention of (1) existing dormer style log cabin operating as tourism accommodation ancillary to adjoining campsite and associated vehicular entrance and existing treatment system (2) existing campsite area gravel pathways and external lighting and associated services (3) 6 no. glamping yurts and ancillary stands forming part of existing camp site (4) toilets block used as part of yurt/camping area and permission is sought for (1) upgrading of existing treatment system and percolation area serving the existing log cabin and glamping yurts/camping area (2) closure of existing entrance to field, (3) signage (4) and all ancillary site works. Significant Further information/Revised plans submitted on this application
No Environment Impact Assesments Associated with this Application