Planning Application: 2460568 (Kildare County Council )
File Number:
2460568
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
24/06/2024
Decision Due Date:
04/02/2025
Validated Date:
24/06/2024
Invalidated Date:
Further Info Requested:
13/08/2024
Further Info Received:
08/01/2025
Withdrawn Date:
Extend Date:
Decision Type:
Refused
Decision Date:
04/02/2025
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
21/01/2025
Applicant Details
Applicant name:
Cadamstown Solar Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
for a period of 10 years to construct and complete a solar PV energy development with a total site area of 80.9 hectares, comprising of the construction of PV panels mounted on metal frames, transformer stations, GRP units, internal access tracks, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, temporary construction compounds, widening of an existing entrance, landscaping and all ancillary infrastructure and associated works. The solar farm would be operational for 35 years. The export capacity to grid is estimated to be c. 56MW MEC. A Natura Impact Statement (NIS) has been prepared in respect of this application. Revised by Significant Further Information which consists of additional passing bays have been included in the
Construction Traffic Management Plan
Development Address:
Townlands of, Mulgeeth and Mucklon,, Co. Kildare
Architect Name:
Location Key:
Mulgeeth and Mucklon,
Electoral Division:
Planner:
Lisa Rothwell
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
04/02/2025
Manager Order:
DO56905
Decision Type:
Refused
Number of Conditions:
1
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
for a period of 10 years to construct and complete a solar PV energy development with a total site area of 80.9 hectares, comprising of the construction of PV panels mounted on metal frames, transformer stations, GRP units, internal access tracks, perimeter fencing with CCTV cameras and access gates, electrical cabling and ducting, temporary construction compounds, widening of an existing entrance, landscaping and all ancillary infrastructure and associated works. The solar farm would be operational for 35 years. The export capacity to grid is estimated to be c. 56MW MEC. A Natura Impact Statement (NIS) has been prepared in respect of this application. Revised by Significant Further Information which consists of additional passing bays have been included in the
Construction Traffic Management Plan