Planning Application: 2460253 (Kildare County Council )
File Number:
2460253
Application Type:
PERMISSION
Planning Status:
DECISION MADE
Received Date:
25/03/2024
Decision Due Date:
19/05/2024
Validated Date:
25/03/2024
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
16/05/2024
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
28/04/2024
Applicant Details
Applicant name:
Electricity Supply Board
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
The development will consist of a 38 kV / MV electrical substation, underground cables and associated works. The development will include the following elements - see site notice for full description due to limited characters here.
1)Construction of a substation compound of approximately 2,850 m2 gross area, with 2.6 m high palisade fence around the entire perimeter of the substation, with the following electrical plant within the substation: 1 No. prefabricated 38 kV GIS module and foundation (c.31m2 and c.5.2 m high); 1 No. prefabricated MV GIS module and foundation (c.32m2 and c.4.7 m high); 1 No. prefabricated Control Room module and foundation (c.32m2 and c.4.7 m high); 2 No. 38/20 kV 10 MVA transformers and associated bunds (c.15m2, c.4.5 m high ea.); Telecommunication SCADA pole of c.10 metres in height; Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; Internal access road of c.40 m in length and c.5m wide within the proposed substation; Compound lighting, boundary treatment, associated drainage, landscaping and all ancillary site development works; 2)Use of a portion of the existing temporary road (c.200 m in length) permitted as part of the recent MSD Rathgall development (Planning Ref: 21/360 & 22/110) for permanent use to facilitate access to the proposed substation; 3)Construction of new stone wall, fencing and gates at the existing junction of the temporary road with the public road; 4)Construction of an internal access road (c.140 m in length) to the proposed substation extending from the existing temporary road on the MSD lands to the proposed substation; 5)Site clearance works related to the proposed substation compound and access road; 6)Installation of c.1.3 kilometres of double-circuit 38 kV underground cables (UGC) along the R448 road between the proposed substation and the existing Carlow – Graigue 38 kV OHL; 7)Installation of c.0.7 kilometres of single circuit 38 kV UGC along the R448 road between the proposed substation and the existing Carlow – Ballylinan 38 kV OHL; 8)Installation of c.0.3 kilometres of six circuit MV UGC along the R448 road between the proposed substation and the existing R448 roundabout; 9)Installation of a new 12 m high steel lattice mast on the existing Carlow – Graigue 38 kV OHL; 10)Replacement of an existing timber poleset (IMP 1395) with a new 15 m high steel lattice mast on the existing Carlow – Ballylinan 38 kV OHL - this application is accompanied by a Natura Impact Statement (NIS)
Development Address:
The townlands of Ballyvergal and Pollertown Little, County Carlow and Knocknagee, County Kildare, Kildare, County KIldare
Architect Name:
Location Key:
Kildare
Electoral Division:
Planner:
Louise Murphy
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
16/05/2024
Manager Order:
DO52733
Decision Type:
Conditional
Number of Conditions:
15
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
Decision Description:
The development will consist of a 38 kV / MV electrical substation, underground cables and associated works. The development will include the following elements - see site notice for full description due to limited characters here.
1)Construction of a substation compound of approximately 2,850 m2 gross area, with 2.6 m high palisade fence around the entire perimeter of the substation, with the following electrical plant within the substation: 1 No. prefabricated 38 kV GIS module and foundation (c.31m2 and c.5.2 m high); 1 No. prefabricated MV GIS module and foundation (c.32m2 and c.4.7 m high); 1 No. prefabricated Control Room module and foundation (c.32m2 and c.4.7 m high); 2 No. 38/20 kV 10 MVA transformers and associated bunds (c.15m2, c.4.5 m high ea.); Telecommunication SCADA pole of c.10 metres in height; Associated and ancillary outdoor electrical equipment and other apparatus, including installation of underground cables; Internal access road of c.40 m in length and c.5m wide within the proposed substation; Compound lighting, boundary treatment, associated drainage, landscaping and all ancillary site development works; 2)Use of a portion of the existing temporary road (c.200 m in length) permitted as part of the recent MSD Rathgall development (Planning Ref: 21/360 & 22/110) for permanent use to facilitate access to the proposed substation; 3)Construction of new stone wall, fencing and gates at the existing junction of the temporary road with the public road; 4)Construction of an internal access road (c.140 m in length) to the proposed substation extending from the existing temporary road on the MSD lands to the proposed substation; 5)Site clearance works related to the proposed substation compound and access road; 6)Installation of c.1.3 kilometres of double-circuit 38 kV underground cables (UGC) along the R448 road between the proposed substation and the existing Carlow – Graigue 38 kV OHL; 7)Installation of c.0.7 kilometres of single circuit 38 kV UGC along the R448 road between the proposed substation and the existing Carlow – Ballylinan 38 kV OHL; 8)Installation of c.0.3 kilometres of six circuit MV UGC along the R448 road between the proposed substation and the existing R448 roundabout; 9)Installation of a new 12 m high steel lattice mast on the existing Carlow – Graigue 38 kV OHL; 10)Replacement of an existing timber poleset (IMP 1395) with a new 15 m high steel lattice mast on the existing Carlow – Ballylinan 38 kV OHL - this application is accompanied by a Natura Impact Statement (NIS)