Planning Application: 24140 (Kildare County Council )
File Number:
24140
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
01/05/2024
Decision Due Date:
25/06/2024
Validated Date:
01/05/2024
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
18/06/2024
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
04/06/2024
Applicant Details
Applicant name:
Liffeybridge Homes Ltd
Applicant Address:
Phone Number:
Fax Number:
25181451
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Development will consist of the demolition of a habitable dwelling (220sq.m) and associated structures: the construction of 14 no. semi-detached houses (10 no.3 bed houses and 4 no. 4 bed houses), with 14 no. residential car parking spaces and 2 no. visitor spaces: amendments to the SHD development (Ref, ABP-304632-19) to integrate the permitted and proposed internal access road, public open spaces and services; and, all necessary and ancillary water services, surface water drainage, landscaping, car and cycle parking and all associated development and works.
Development Address:
Capdoo, Clane, Co. Kildare
Architect Name:
Niall Murphy MOLA Architects
Location Key:
Clane
Electoral Division:
Planner:
Damien McGrath
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
18/06/2024
Manager Order:
DO53258
Decision Type:
Conditional
Number of Conditions:
33
Grant Date:
30/07/2024
Grant Managers Order #:
DO53258
Section 47
Apply?:
No
Part 5
Apply?:
No
Expiry Date:
29/07/2029
Decision Description:
Development will consist of the demolition of a habitable dwelling (220sq.m) and associated structures: the construction of 14 no. semi-detached houses (10 no.3 bed houses and 4 no. 4 bed houses), with 14 no. residential car parking spaces and 2 no. visitor spaces: amendments to the SHD development (Ref, ABP-304632-19) to integrate the permitted and proposed internal access road, public open spaces and services; and, all necessary and ancillary water services, surface water drainage, landscaping, car and cycle parking and all associated development and works.
STRATEGIC HOUSING DEVELOPMENT (ABP Decision) demolition of all existing structures on site, including 1 no. habitable house, agricultural structures and domestic sheds; development of 366 no. new residential units; a childcare facility (316sqm GFA approx.); a new Link Road connecting the R407 (College Road / Kilcock Road) to Capdoo Park and the R403 (Celbridge Road) beyond, incorporating cycle tracks and footpaths on both sides of the carriageway, together with a new roundabout on the R407 and all necessary upgrades to existing junctions and road realignments at both the R407 and Capdoo Park; associated internal access roads, pedestrian and cycle paths and linkages; open space; and all associated site and development works