081988 |
APPLICATION FINALISED |
RETENTION |
C |
27/11/2008 Thursday |
Salesian Community |
Maynooth Road Celbridge Co Kildare. |
to incorporate ecohorticultural education facility structures, selected crops and planting areas, and retention of existing scout huts. Structures to include the following: 1 Provision of 2 number 84m2 timber frame teaching facility units etc |
19918 |
APPLICATION FINALISED |
PERMISSION |
C |
14/08/2019 Wednesday |
|
Salesian College, Moortown, Celbridge, |
construction of new single storey ASD unit 659 sq.m to rear of existing school buildings comprising classrooms, tuition rooms, activity rooms, sensory & calm rooms, consultation and meeting rooms, office, storage and WCs; single storey enclosed link corridor 117 sq.m to existing classroom building, outdoor play area, new internal vehicular access surface and set-down area and all associated site works |
20577 |
APPLICATION FINALISED |
PERMISSION |
C |
08/06/2020 Monday |
The BOM of Salesian College Celbridge |
Salesian College Celbridge, Moortown, Celbridge, |
for construction of a new single storey extension, consisting of a new main entrance canopy, a new main entrance lobby/reception area and all associated site works |
22418 |
APPLICATION FINALISED |
PERMISSION |
C |
12/04/2022 Tuesday |
Cúnamh Cuideachta Faoi Theorainn Ráthaíochta, Salesians of Don Bosco Ireland, |
Salesians College Celbridge, Maynooth Road, Moortown, |
(1) 6 No. 15 metre high columns to the perimeter of our soccer pitch which is located to the left and rear of our site when viewed from the public road. These columns are to be used to mount floodlights to illuminate the pitch. (2) All ancillary ground works associated with the above project. The above works to be carried out on our site |
22419 |
APPLICATION FINALISED |
PERMISSION |
C |
12/04/2022 Tuesday |
Cúnamh Cuideachta Faoi Theorainn Ráthaíochta, Salesians of Don Bosco Ireland, |
Salesians College Celbridge, Maynooth Road, Moortown, |
(1) A new synthetic Astro Platform 102 metres x 66 metres to be used as an all-weather soccer pitch at the location of the existing grass soccer pitch which is located to the rear and left hand side of our grounds when viewed from the public road. (2) Fencing to the perimeter of the pitch which consists of 2.40 metres high of double 868 mesh with 2.60 metres high ball stopping netting giving a total height of 5.00 metres. (3) To the rear of the goals at either end of the pitch for a distance of 28 metres the 2.60 metres high ball stopping netting is to be increased to 10.60 metres giving a total height of 13.00 metres at these two locations. (4) To lay a temporary hardcore and gravel construction roadway to the right hand side of our College when viewed from the public road. Also, a Contractor's compound located beside the existing hard surface basketball court located to the rear of the site. (5) Eleven number lateral drains under the proposed Astro Pitch connected to a main drain and discarding to a soakaway designed and constructed to BRE 365 and approved by the County Council. (6) All ancillary ground works associated with the above project. The above works to be carried out on our site |
23850 |
APPLICATION FINALISED |
PERMISSION |
C |
17/08/2023 Thursday |
|
Arce Project Salesian College Celbridge |
the construction of a detached new single storey pitched roof timber cabin structure with small store & front porch for use by the Celbridge Men's & Women's Shed Project for multifunctional crafts, hobby, book club, social meetings (less than 40 people) & associated uses & to include minor associated works & amendments as necessary to site boundaries, landscaping etc |