Planning Application: 13975 (Kildare County Council )
File Number:
13975
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
09/12/2013
Decision Due Date:
19/03/2014
Validated Date:
09/12/2013
Invalidated Date:
Further Info Requested:
06/02/2014
Further Info Received:
20/02/2014
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
14/03/2014
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
MGS Manufacturing Group Ltd
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
The development will consist of the erection of four 3m.diameter x 10m. high raw material storage silos in the open yard to the rear of Buildings 2,3 and 4, to include all associated site works
Development Address:
Building 3, Liffeypark Technology Campus, Barnhall Road, Leixlip, Co Kildare
Architect Name:
Noel Earley
Location Key:
BARNHALL LEIXLIP
Electoral Division:
Planner:
Anthony Kelly
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
14/03/2014
Manager Order:
38144
Decision Type:
Conditional
Number of Conditions:
3
Grant Date:
14/04/2014
Grant Managers Order #:
38144
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
13/04/2019
Decision Description:
The development will consist of the erection of four 3m.diameter x 10m. high raw material storage silos in the open yard to the rear of Buildings 2,3 and 4, to include all associated site works
Liffey Park Technology Campus, Barnhall Rd, Parsonstown, Leixlip,
Retention permission for development specifically relates to Building No.4, retention permission consists of the retention of the mezzanine area(121 sqm) on the first floor level. This consists of office space, toilets, and a canteen. Retention permission is sought for any associated site works that would have occurred due to the construction of the mezzanine.
Kildare Innovation Centre, Barnhall Road, Leixlip,
erection of six 3m diameter x 10m high raw material storage siles in the open yard to the rear of buildings 2, 3, and 4. Two new fire exit doors (double doors) to building 2 (south west elevation.) Retention of the erection of two 3m diameter x 10m high raw material storage silos in the open yard to the rear of buildings 2, 3, and 4.
will consist of erection of Six 3m diameter x 10m high raw material storage silos in the open yard to the rear of Buildings, 2, 3 and 4. Two new fire exit doors (double doors) to Building 2 (South West Elevation). Retention of the erection of Two 3m diameter x 10m high raw material storage silos in the open yard to the rear of Buildings 2, 3 and 4
No Environment Impact Assesments Associated with this Application