Planning Application: 11121 (Kildare County Council )
File Number:
11121
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
09/02/2011
Decision Due Date:
24/05/2011
Validated Date:
09/02/2011
Invalidated Date:
Further Info Requested:
05/04/2011
Further Info Received:
27/04/2011
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
24/05/2011
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
Applicant Details
Applicant name:
Kilsaran Concrete
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
to modify the development as approved under planning permission 09/1160 (PL 09.236926) with the removal of the “open sided block curing shed (7.2 metres high approximately)” and the subsequent amendment of condition 30 (Development Contribution) to reflect the revised development. The development will consist of a concrete manufacturing facility comprising a concrete batching plant (13.6 m high approximately), a block yard, prefabricated shipping office with a gross floor area of 88 sq. m. approximately, weighbridge, two bunded and covered fuel tanks and septic tank at the existing Kilsaran Concrete aggregates/dry mortar facility. The application area is 2.3 hectares
Development Address:
Brownstown,, Kilcullen,, Co. Kildare.
Architect Name:
Fergus Gallagher & Ian Sunderland
Location Key:
BROWNSTOWN KILCULLEN
Electoral Division:
Planner:
Damian Daly
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
24/05/2011
Manager Order:
35718
Decision Type:
Conditional
Number of Conditions:
30
Grant Date:
28/06/2011
Grant Managers Order #:
35718
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
27/06/2016
Decision Description:
to modify the development as approved under planning permission 09/1160 (PL 09.236926) with the removal of the “open sided block curing shed (7.2 metres high approximately)” and the subsequent amendment of condition 30 (Development Contribution) to reflect the revised development. The development will consist of a concrete manufacturing facility comprising a concrete batching plant (13.6 m high approximately), a block yard, prefabricated shipping office with a gross floor area of 88 sq. m. approximately, weighbridge, two bunded and covered fuel tanks and septic tank at the existing Kilsaran Concrete aggregates/dry mortar facility. The application area is 2.3 hectares
(1) Extensions to Tile Manufacturing Building previously permitted under reg. Ref. 17/1224 and ABP Ref. 302199/18 comprising of: (a) Lean-to extension for carpentry storage (99sqm gross floor area, max 8.5m high) to the south eastern building elevation; (b) Lean-to extension for casting components/build materials storage (630sqm gross floor area, max 8.5m high) to the south eastern building elevation; (c) Two storey (max 9.5m high) extension consisting of welfare/office facilities at mezzanine level (270sqm gross floor area) and additional storage at ground floor level (270sqm gross floor area) to north eastern building elevation; (d) New wastewater treatment system and percolation area. (2) Construction of two storey office extension (298sqm gross floor area, 7.6m high) to the existing south western elevation of the Dry Batch Mortar Building also previously permitted under Reg. Ref. 17/1224 and ABP Reg. Ref. 302199/18. (3) A new bagging shed (240sqm gross floor area, max 8.0m high). All associated site works. It is proposed that the duration of the proposed development would run concurrent with that of Planning Ref. 17/1224 and ABP-302199-18, which is due to expire on 17/02/2039, development
Corbally and Brownstown townlands, Kilcullen Co. Kildare
a planning application area of c. 20.6 hectares consisting of a combined proposed extraction area (Area 1, c. 10.3 hectares) and proposed early reinstatement area (Area 2, c. 10.3 hectares). Area 1 will consist of an extension to the west of the existing sand and gravel pit with an extraction footprint of c. 8.7 hectares. The sand and gravel extraction (c. 2.4m tonnes) will be dry working above the water table. Stripping and storage of topsoil and overburden materials from the extension lands for reuse in the restoration works. Restoration of the extraction area will be to a beneficial agricultural after-use and form part of the restoration of the extraction area, as permitted under planning ref. 17/1224 (ABP-302199-18). Area 2 will consist of an amendment to the permitted extraction area of planning ref. 17/1224 (ABP-302199-18) by the omission of a c. 4.7 hectare area and the early reinstatement of a partially extracted c. 2.7 hectare area of the existing permitted c. 7.4 hectares extraction area. It is proposed that the duration of the proposed development would run concurrent with that of planning ref. 17/1224 (ABP-302199-18), which is due to expire on 17/02/2039. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application
a new extension (max 11m high with a gross floor area of 3,000m²) to an existing manufacturing building (previously permitted under Reg. Ref. 20/140; Reg. Ref. 17/1224 and ABP Ref. No. 302199-18) to provide storage for precast concrete products and all ancillary works
No Environment Impact Assesments Associated with this Application