(1) Extensions to Tile Manufacturing Building previously permitted under reg. Ref. 17/1224 and ABP Ref. 302199/18 comprising of: (a) Lean-to extension for carpentry storage (99sqm gross floor area, max 8.5m high) to the south eastern building elevation; (b) Lean-to extension for casting components/build materials storage (630sqm gross floor area, max 8.5m high) to the south eastern building elevation; (c) Two storey (max 9.5m high) extension consisting of welfare/office facilities at mezzanine level (270sqm gross floor area) and additional storage at ground floor level (270sqm gross floor area) to north eastern building elevation; (d) New wastewater treatment system and percolation area. (2) Construction of two storey office extension (298sqm gross floor area, 7.6m high) to the existing south western elevation of the Dry Batch Mortar Building also previously permitted under Reg. Ref. 17/1224 and ABP Reg. Ref. 302199/18. (3) A new bagging shed (240sqm gross floor area, max 8.0m high). All associated site works. It is proposed that the duration of the proposed development would run concurrent with that of Planning Ref. 17/1224 and ABP-302199-18, which is due to expire on 17/02/2039, development
Corbally and Brownstown townlands, Kilcullen Co. Kildare
a planning application area of c. 20.6 hectares consisting of a combined proposed extraction area (Area 1, c. 10.3 hectares) and proposed early reinstatement area (Area 2, c. 10.3 hectares). Area 1 will consist of an extension to the west of the existing sand and gravel pit with an extraction footprint of c. 8.7 hectares. The sand and gravel extraction (c. 2.4m tonnes) will be dry working above the water table. Stripping and storage of topsoil and overburden materials from the extension lands for reuse in the restoration works. Restoration of the extraction area will be to a beneficial agricultural after-use and form part of the restoration of the extraction area, as permitted under planning ref. 17/1224 (ABP-302199-18). Area 2 will consist of an amendment to the permitted extraction area of planning ref. 17/1224 (ABP-302199-18) by the omission of a c. 4.7 hectare area and the early reinstatement of a partially extracted c. 2.7 hectare area of the existing permitted c. 7.4 hectares extraction area. It is proposed that the duration of the proposed development would run concurrent with that of planning ref. 17/1224 (ABP-302199-18), which is due to expire on 17/02/2039. An Environmental Impact Assessment Report (EIAR) has been prepared in respect of this planning application
a new extension (max 11m high with a gross floor area of 3,000m²) to an existing manufacturing building (previously permitted under Reg. Ref. 20/140; Reg. Ref. 17/1224 and ABP Ref. No. 302199-18) to provide storage for precast concrete products and all ancillary works
No Environment Impact Assesments Associated with this Application