211248 |
APPLICATION FINALISED |
PERMISSION |
C |
31/08/2021 Tuesday |
Barola Capital DAC, |
Great Connell, Newbridge, Co. Kildare. |
for a Distribution Warehouse, Ancillary Office Accommodation and Ancillary Buildings with a cumulative gross floor area (GFA) of c.64,550sqm at a 15.42ha site to the south of the Newbridge South Orbital Relief Road (NSORR) in the townland of Greatconnell, Newbridge, Co. Kildare. The development will consist of: (i) Construction of a Distribution Warehouse Building (approx. 62,925sqm gross floor area (GFA) with principal dimensions of 147m width and 306m length, maximum height of 23.5m with 2 No. projections of 26m to accommodate stairwells, one on the northern elevation and one on the south-eastern elevation, inclusive of: a) Main Entrance Office over 2 No. storeys to the north of the building with a maximum height of 12.1m (495.98sqm) comprising at ground floor: reception area, circulation space and welfare facilities, and at first floor: break room, training room and welfare facilities; b) Mezzanine Office accommodation, meeting rooms and welfare facilities (combined 1,316.49sqm) extending above the 18 No. outbound docks to the north elevation; c) Transport Office with associated welfare facilities over 2 No. storeys to the east of the warehouse building with a maximum height of 12.4m (total 656.54sqm); and d) Textile Storage Area comprising 3 No. mezzanine floors adjacent to the mezzanine office (combined 14,343sqm); (ii) Security Gatehouse at the HGV site entrance (north-east boundary) with a GFA of 27sqm, overall dimensions of 7.8m width and 3.5m length and maximum height of 5m; (iii) Pallet Storage Building with a GFA of 600sqm to the east of the distribution warehouse building, overall dimensions of 15m width and 44m length and maximum height of 6.6m; (iv) Recovery Recycling Unit (RRU) Building with a GFA of 998sqm to the east of the distribution warehouse building, overall dimensions of 41m width and 24m length and maximum height of 11m; (v) Smoking Shelter with a GFA of 39.3sqm to the north-east of the distribution warehouse building, with overall dimensions of 4.5m width and 8.8m length and maximum height of 2.4m; (vi) 3 No. sprinkler tanks to the south of the distribution warehouse building, including 2 No. sprinkler tanks with a diameter of 11.6m and height of 7.2m and 1 No. sprinkler tank with a diameter of 7.75m and height of 6m; (vii) 1 No. sprinkler pump house to the south of the distribution warehouse building with a total GFA of 159sqm with a dimension of 17.4m in width, 9.6m in length and 3.85m in height; (viii) 1 No. electricity |
211780 |
APPLICATION FINALISED |
PERMISSION |
C |
17/12/2021 Friday |
Murphy International Limited, |
Great Connell, Newbridge, Co. Kildare. |
works to the existing Murphy International Limited Headquarters to accommodate two new industrial buildings, comprising a Steel Fabrication building and a Pipe Ancillary building, and associated development and works. The Steel Fabrication Building of 2,495 sqm is 13.1 metres in height and accommodates a fabrication area of 2,229 sqm and a staff welfare area of 133 sqm at ground floor level, and an ancillary office of 133 sqm at first floor level. The Pipe Ancillary Building of 760 sqm is single storey and 9.3 metres in height, and will accommodate workshops. Solar photovoltaic panels are proposed on the roofs of both buildings. It is proposed to demolish 4 No. existing buildings including an Office (300sqm), Lean-to Warehouse (240 sqm), Warehouse (415 sqm), and a Storage Barn (112 sqm), and to demolish the existing boundary walls on Great Connell Road and on part of the existing access road. It is proposed to upgrade the existing access road to provide a 7.5 metre carriageway, 1.5 metre grass verge, 2 metre cycle lane, 2 metre footpaths, tree planting and a 2.5 metre boundary wall to the subject site, and to upgrade the boundary on Great Connell Road by removing the existing entrances and providing a 1.5 metre grass verge, 2 metre cycle lane, 2 metre foot path, tree planting and a 2.5 metre acoustic timber fence. It is proposed to provide 84 No. car parking spaces and 33 No. bike parking spaces, 3 No. signs of 5.2 sqm each are proposed; 1 No. on the southwest elevation of the Steel Fabrication Building, 1 No. on the northeast elevation of the Pipe Ancillary Building, and 1 No. on the northwest elevation of the Pipe Ancillary Building. The existing yard will be extended by 0.9 ha. These and all ancillary works including the regrading of an existing drainage ditch, all water infrastructure, internal roads, and landscaping are proposed on a site of 4.7 ha. |
24393 |
NEW APPLICATION |
PERMISSION |
|
20/12/2024 Friday |
Murphy International Limited |
Great Connell Newbridge Co Kildare |
For the consolidation and extend the established and permitted industrial and related activities on the MIL headquarters and industrial site to accommodate immediate and medium-term business development and employment generation objectives, to rationalise the car parking on the overall site to enhance safety for employees and site operatives, to make more efficient use of the space available on site and to enhance operational efficiencies, and related environmental and public realm improvements at the MIL headquarters complex. The proposed extension and works compromise the following: (1) Extension of the established yard over an area of 1.67 ha to the south of the established yard area to accommodate: (a) the construction of a vehicle maintenance building and associated offices (1,459 sq.m GFA) incorporating solar PV panels at roof level (224 sq.m), and 8 no. external storage tanks; (b) the extension of permitted access spur road off the Newbridge Southern Outer Orbital Route (NSOOR) over a distance of 44.5 m (KCC Ref: 211780) to accommodate access to the extended yard area, and a new agricultural access on the eastern side of the proposed road extension; (c) the construction of a two storey security and access control building at the entrance to site (269 sq.m GFA) incorporating solar PV Panels at roof level (22 sq.m); (d) a materials and construction equipment storage area; (e) a construction site cabin and container maintenance and storage area; (f) a vehicle and equipment wash down bay; (g) a HGV fueling plinth and above ground fuel tanks; (h) surface water drainage infrastructure; (i) HGV and service vehicle parking (8 no. spaces), plant maintenance with EV charging points; and (j) all associated landscaping, and ancillary development and works. (2) The reconfiguration and consolidation of existing car parking on the wider site (constructed under Reg. Ref. 21/1780) into a single car park on the eastern boundary of the yard accommodating 150 car parking spaces, an increase of 20 no. car parking spaces over that previously permitted, and the use of the relocated car parking areas as yard area ancillary to the established use of the site. (3) The removal of a surface water attenuation swale constructed under Ref. Ref. 21/1780 and the incorporation of that attenuation volume into a related swale and a proposed new underground stormtech attenuation system. (4) The demolition of an established storage building of 178 sq.m. (5) Retention of an enclosed canopy (105 sq.m) over the steel roller feed on the southern elevation of the Steel Fabrication Building. (There is no change in the floor area of the building as permitted.) (6) Retention of the related footprint of the permitted Pipe Ancillary Building permitted under Reg. Ref. 21/1780, to a location 11.5m to the south of that permitted. (7) Retention of an enclosed canopy (80 sq.m) over the steel roller feed on the eastern elevation of the Pipe Fabrication Building, (There is no change in the floor area of the building as permitted.) (8) Construction of a sheltered walkway from the proposed car park to the established offices at a height of 2.4 m above ground level for a distance of 132 m. (9) The provision of an additional room to the existing ESB substation adjoining the existing steel and pipe fabrication building, and a new substation switchroom on the proposed yard extension area. (10) Additional bicycle parking structures to accommodate c.56 bicycles adjoining the existing office building. (11) Widening of the established northern access on the eastern boundary from 7 m to 12 m and relocation of the established southern access to a location 22.5m to the south of that permitted (Reg. Ref. 21/1780), and associated works to the footpath and bike lane. (12) Amendment of the permission granted under Kildare County Council Reg. Ref. 21/1780 to omit the cycleway, pedestrian path and acoustic barrier along a length of 14 m on the Greatconnell Road, and replacement with a 2 m wall along that length. (13) All associated development and works including internal circulation routes; surface water, water services and utilities infrastructure including site lighting landscaping and works |
991828 |
APPLICATION FINALISED |
PERMISSION |
C |
22/10/1999 Friday |
Ballyfarm Ltd. |
Great Connell Newbridge Co. Kildare |
infrastructural development to provide entrance, roads, footpaths, sewers,public lighting, watermains and other services and all other ancillary works for a 93 acre (37.7 hectare) business park etc |