Planning application details ref: 2460295 Kerry County Council

100%100% Complete (warning)

Planning Application: 2460295 (Kerry County Council )
File Number: 2460295
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 14/05/2024 Decision Due Date: 08/07/2024
Validated Date: 14/05/2024 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 08/07/2024
Leave to Appeal: Appeal Date: 26/07/2024
Commenced Date: Submissions By: 17/06/2024

Applicant Details

Applicant name: Portal Asset Holdings Ltd
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: The construction of a residential development of: 224 no. residential units with ancillary two storey crèche, landscaping, road improvements, pedestrian / cycleways, storm water upgrades and associated site development works. The proposed development makes provision for 76 houses comprising of 8 no. 2-storey 2-bedroom townhouses, 28 no. 2-storey 3-bedroom townhouses, 10 no. 2-storey 3-bedroom semi-detached units and 30 no. 2-storey 4-bedroom semi-detached units. The proposed development includes 148 no. apartments / duplexes to be provided as follows: Block 1 (4 no. 2-bedroom & 4 no. 3-bedroom over 3 storeys), Block 2 (2 no. 2-bedroom & 2 no. 3-bedroom over 3-storeys), Block 3 (4 no. 1-bedroom, 10 no. 2-bedroom and 6 no. 3-bedroom over 3-storeys), Block 4 (10 no. 1-bedroom & 10 no. 2-bedroom over 3-storeys), Block J (32 no. 2-bedroom over 4 storeys), Block K (16 no. 1-bedroom apartments & 16 no. 2-bedroom apartments over 4 storeys) Block L (32 no. 2-bedroom apartments over 4 storeys). The proposed development will provide for a new vehicular access and pedestrian entrances onto Port Road, upgrades to Port Road comprising reduction in carriageway widths, provision of shared pedestrian/cycle path and uncontrolled pedestrian crossing, and a pedestrian connection to Millwood Estate. It is proposed to upgrade the stormwater network on St. Margaret’s Road (approximately 140 metres north of the main development site) to support the development. Ancillary infrastructure development works will include relocation/undergrounding of ESB powerlines, wastewater infrastructure including foul pumping station, surface water attenuation, water utility services, public lighting, bin stores, bicycle stores, ESB substations, and all associated site development works. A Natura Impact Statement has been prepared in respect of the proposed development.
Development Address: Port Road and St Margaret’s Road,, Coollegrean, Inch, Knockreer, Ardnamweely, Derreen (townlands),, Killarney, Co. Kerry.
Architect Name: Location Key: PORT ROAD KILLARNEY
Electoral Division: Causeway (Part Of) Planner: Sean Flahive
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 08/07/2024 Manager Order:
Decision Type: Conditional Number of Conditions: 46
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?: Yes
Expiry Date: 11/11/2029
Decision Description: The construction of a residential development of: 224 no. residential units with ancillary two storey crèche, landscaping, road improvements, pedestrian / cycleways, storm water upgrades and associated site development works. The proposed development makes provision for 76 houses comprising of 8 no. 2-storey 2-bedroom townhouses, 28 no. 2-storey 3-bedroom townhouses, 10 no. 2-storey 3-bedroom semi-detached units and 30 no. 2-storey 4-bedroom semi-detached units. The proposed development includes 148 no. apartments / duplexes to be provided as follows: Block 1 (4 no. 2-bedroom & 4 no. 3-bedroom over 3 storeys), Block 2 (2 no. 2-bedroom & 2 no. 3-bedroom over 3-storeys), Block 3 (4 no. 1-bedroom, 10 no. 2-bedroom and 6 no. 3-bedroom over 3-storeys), Block 4 (10 no. 1-bedroom & 10 no. 2-bedroom over 3-storeys), Block J (32 no. 2-bedroom over 4 storeys), Block K (16 no. 1-bedroom apartments & 16 no. 2-bedroom apartments over 4 storeys) Block L (32 no. 2-bedroom apartments over 4 storeys). The proposed development will provide for a new vehicular access and pedestrian entrances onto Port Road, upgrades to Port Road comprising reduction in carriageway widths, provision of shared pedestrian/cycle path and uncontrolled pedestrian crossing, and a pedestrian connection to Millwood Estate. It is proposed to upgrade the stormwater network on St. Margaret’s Road (approximately 140 metres north of the main development site) to support the development. Ancillary infrastructure development works will include relocation/undergrounding of ESB powerlines, wastewater infrastructure including foul pumping station, surface water attenuation, water utility services, public lighting, bin stores, bicycle stores, ESB substations, and all associated site development works. A Natura Impact Statement has been prepared in respect of the proposed development.

Appeal Details


Appeal Details
Notification Date: 01/08/2024 BP Reference #: ABP-320288-24
Appeal Type: THIRD PARTY File Forward Date: 09/08/2024
Submission Due Date: 22/08/2024 Submission Sent Date:
Appeal Decision: CONDITIONAL Decision Date: 12/11/2024
Withdrawn Date: Dismissed Date:
Reason: