15213 |
APPLICATION FINALISED |
RETENTION |
C |
11/08/2015 Tuesday |
Vodafone Ireland Ltd. |
Merlin Park Hospital Merlin Park Galway |
Permission for retention for existing telecommunications equipment (antennae and link dishes), associated Cabin, associated ancillary works on roof of existing boiler house building. The development will continue to form part of Vodafone Ireland Ltd's existing GSM and 3G Broadband telecommunications network |
15376 |
APPLICATION FINALISED |
PERMISSION |
C |
23/12/2015 Wednesday |
Health Service Executive |
St. Anne's CAMH Unit Merlin Park Hospital Galway |
Permission for the following works: 1. A 34m2 single storey extension on the North-Eastern side of the Adolescent Unit, consisting of a meeting room, together with associated internal changes. 2. A 53m2 single storey extension on the North-Western side of the Adolescent Unit, consisting of two additional single bedrooms. 3. A 52m2 single storey extension consisting of a link building with one additional bedroom and Homework Room between the Children's Unit and the Adolescent Unit on the southern side of the complex, together with associated internal changes. 4. External alterations to the fenestration in the Special Care Unit on the South-Eastern side of the Adolescent Unit |
18103 |
APPLICATION FINALISED |
PERMISSION |
C |
04/04/2018 Wednesday |
Health Service Executive (West) |
Merlin Park University Hospital Galway |
Permission to construct a 613m2 ambulance base building with 129m2 integral garage and 2 no. attached canopied parking bays, 19 no. canopied emergency vehicle parking bays, alterations to existing access road, car parking and general signage, together with all associated site works and services |
20173 |
APPLICATION FINALISED |
PERMISSION |
C |
01/07/2020 Wednesday |
Grainne Cahill Health Services Executive (West) |
Merlin Park University Hospital Galway |
Permission is sought for the development which will consist of revisions to granted planning permission Ref 18/423 to construct a new Theatre building (620m2) and link and stores (139m2), roof top plant space (383m2), including construction of a service road, gas compound and boiler room (61m2) and all associated site works and services (total area 1203m2) |
21289 |
APPLICATION FINALISED |
PERMISSION |
C |
03/09/2021 Friday |
Health Service Exective |
Merlin Park University Hospital Galway |
Permission for development which will consist of -Construction of a 2,324.3 sq.m (gross) two- storey Outpatients Department Building. - Construction of a 314.7 sq.m (gross) single storey Adult Cystic Fibrosis Outpatients Building - Construction of 88 no. bay car park (comprising 77 no. bay car park south of proposed Outpatients Department Building and the provision of 11 no. car park bays adjacent to Existing Unit 8) - Provision of pedestrian footpath connection to north to location adjoining Medical Records Building -Provision of bicycle parking, public lighting, roof mounted solar PV panels, roof plant, site landscaping, services, signage and all associated site development works |
23160 |
APPLICATION FINALISED |
PERMISSION |
C |
23/06/2023 Friday |
Health Service Executive |
Merlin Park University Hospital Galway |
Permission for development which consists of the following:- The provision of a three storey Surgical Hub building (Gross Floor Area: 4,265 sq.m) to include: - Staff Services, Storage and Plant Rooms at Ground Floor Level; - Operating Theatres, Preparation Area, Recovery Area, Waiting Area and ancillary support services at First Floor Level; and -Plant and associated equipment at Second Floor Level. - The provision of roof mounted Solar PV Panels; - The provision of 108 no. car parking spaces (including 6 no. accessible spaces and 20 no. EV charging spaces); - The provision of a new bus stop to be located adjacent to the proposed development; and - All landscaping and other associated site development works required to facilitate the proposed development |
fs9320 |
DECISION MADE |
APPROVAL |
C |
30/03/2020 Monday |
HSE West Estates Department |
Merlin Park University Hospital Merlin Park Galway |
extension to a building; the proposed works comprise the construction of a two storey orthopaedic theatre development - comprising of ground floor level theatre and recovery area accommodation with new link corridor to the existing hospital with first floor level plant area serving the theatres |
fs9420 |
DECISION MADE |
APPROVAL |
U |
30/03/2020 Monday |
HSE West Estates Department |
Merlin Park University Hospital Merlin Park Galway |
Construction of new building: Gas store for the proposed phase 1 Orthopaedic Theatres project |
fs10120 |
DECISION MADE |
APPROVAL |
U |
17/04/2020 Friday |
HSE WEST |
Merlin Park University Hospital Merlin Park Galway |
Extension to a building: the development will consist of an extension to the existing hospital to provide two new Orthopaedic Theatres, recovery bays and support accommodation linked back to the existing hospital via a link corridor. Over part of the ground floor an enclosed plant room is provided and a separate generator and gas store are located externally. The building shall be accessed via the existing hospital accommodation and is intended to replace two redundant existing theatres and as such does not represent and increase in staffing or car parking. |