File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
1351568 |
APPLICATION FINALISED |
PERMISSION |
R |
11/12/2013 Wednesday |
GLENMORE ESTATE AGHAVEAGH NW LTD |
CAVANAWEERY CASTLEFINN LIFFORD PO |
DEVELOPMENT OF A COMMERCIAL CENTRALISED ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE DEMOLITION OF THE DWELLING AND ALL OUTBUILDINGS AND OTHER STRUCTURES WITHIN THE SITE, CONSTRUCTION OF FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, A CO-JOINING PUMP ROOM AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANAEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING: TWO FEED HOPPERS, PRE PIT, CHP BUILDING, FLARE, GAS COMPRESSION & CO2 BUILDING,BIOGAS PURIFICATION & BOTTLING UNIT, RECEPTION TANK, MIXING TANK AND PASTEURISATION BUILDING. WORKS SHALL INCLUDE THE PROVISION OF A CONCRETE APRON, ALL DRAINAGE,ALL OTHER ASSOCIATED SITE WORKS, THE PROVISION OF A NEW ACCESS LANEWAY TO THE SITE FROM THE LOCAL ROAD AND THE WIDENING OF THE LOCAL ROAD ON BOTH SIDES OF THE PROPOSED ENTRANCE |
1451399 |
APPLICATION FINALISED |
PERMISSION |
C |
02/12/2014 Tuesday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
(1) A COMMERCIAL CENTRALISED ANAEROBIC DIGESTER WHICH SHALL PROCESS ALTERNATIVE FEEDSTOCK'S AND PRODUCE RENEWABLE ENERGY AND FERTILISER. THE WORKS SHALL INVOLVE THE CONSTRUCTION/ PROVISION OF THE FOLLOWING: (A) FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, (B) PUMP HOUSE BUILDING, (C) CONTROL BUILDING, (D) C02 COMPRESSION BUILDING, COOLING TOWER,GAS STORAGE TANKS AND TRUCK FILING POINT, (E) PROVISION OF A CONTAINERISED CHP ENGINE AND AN ASSOCIATED STACK, (F) BIOGAS PURIFICATION AND BOTTLING PLANT UNIT, (G) A FEEDSTOCK RECEPTION BUILDING CONTAINING FEEDSTOCKS AREAS, LIQUID FEED TANKS, PASTEURISATION TANKS, (H) WEIGHBRIDGE, LORRY WASH-DOWN AREA, WATER PUMPING STATION, STORM WATER INTERCEPTOR , WASTE WATER STORAGE TANK, SUD'S STORM WATER ATTENUATION, RETAINING WALL, BUND WALL AND ASSOCIATED LANDSCAPING (I) PROVISION OF A PRE PIT, FLARE, CARBON FILTER AND STACK (J) ALL DRAINAGE AND OTHER ASSOCIATED SITE DEVELOPMENT WORKS AND (2) RETENTION AND COMPLETION OF TWO ACCESS ROADS TO SERVICE THE SITE LINKING IT TO EXISTING ROADS WITHIN THE GLENMORE ESTATE |
1551366 |
APPLICATION FINALISED |
PERMISSION |
C |
16/10/2015 Friday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
RETENTION AND COMPLETION FOR THE DEVELOPMENT OF A VEHICULAR ENTRANCE IN LIEU OF PROPOSED ACCESS APPROVED UNDER PLANNING REF:14/51399 AND ASSOCIATED SITE DEVELOPMENT WORKS. THE VEHICULAR ENTRANCE CONNECTS DIRECTLY WITH THE ADJOINING REGIONAL ROAD R-253-1 AND INCLUDES A NEW SECTION OF INTERNAL ACCESS ROAD WHICH CONNECTS WITH THE PREVIOUSLY APPROVED INTERNAL ROADWAY |
1650644 |
APPLICATION FINALISED |
PERMISSION |
C |
06/05/2016 Friday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
CONSTRUCTION OF AN EXTENSION CONSISTING OF AN ELECTRICAL SUBSTATION TO THE CONTROL BUILDING CURRENTLY UNDER CONSTRUCTION AND APPROVED UNDER PLANNING REF. NO:14/51399 |
1850910 |
APPLICATION FINALISED |
RETENTION PERMISSION |
C |
11/06/2018 Monday |
|
AGHAVEAGH BALLYBOFEY LIFFORD PO |
THE FLARE, PROCESS SUMP, WASHDOWN AREA,CO2 COMPRESSION BUILDING, 2 NO. CO2 TANKS AND WEIGHBRIDGE WHICH ARE IN LIEU OF THOSE APPROVED UNDER 14/51399. A BOILER HOUSE, CARBOSCAN CONTAINER, 2 NO. FURTHER CO2 TANKS, SECURITY HUT AT THE WEIGHTBRIDGE, A CONTROLS BUILDING, 3 NO. DIGESTATE DISPATCH TANK, 2 NO. TRANSFORMERS, ODUR CONTROL UNIT, OFFICE EXTENSION, EXTENSION TO THE NORTH -EAST CORNER OF THE YARD AND CLOSURE OF THE INTERNAL ROAD LINKING THE BIOGAS FACILITY TO THE WIDER GLENMORE ESTATE AT THE SOUTH EASTERN CORNER OF THE SITEAND ALL ASSOCIATED SITE WORKS ON LANDS ACCESSED OFF THE ADJOINING REGIONAL ROAD R-253-1 ASSOCIATED WITH GLENMORE ESTATES BIOGAS FACILITY |
1950042 |
APPLICATION FINALISED |
PERMISSION |
C |
21/01/2019 Monday |
|
GLENMORE ESTATE AGHAVEAGH BALLYBOFEY |
DEVELOPMENT WORKS AT THE GLENMORE BIOGAS PLANT, WHICH SHALL PROCESS ALTERNATIVE FEEDSTOCKS AND PRODUCE RENEWABLE ENERGY AND FERTILISER. THE DEVELOPMENT WILL BE ACCESSED VIA THE EXISTING INTERNAL CONNECTING ACCESS ROAD WITHIN GLENMORE ESTATE WHICH LINKS THE SITE TO THE R253. THE WORKS INVOLVE: (1) DEVELOPMENT WITHIN CURTILAGE OF THE EXISTING BIOGAS PLANT INVOLVING (A) THE CONSTRUCTION/ PROVISION OF AN EXTENSION TO THE EXISTING FEEDSTOCK (WASTE) RECEPTION BUILDING TO ACCOMMODATE FEEDSTOCK RECEPTION ACTIVITIES AND DIGESTATE PROCESSING EQUIPMENT, (B) GAS PURIFICATION AND COMPRESSION PLANT, (C) OFFICE EXTENSION (FIRST FLOOR OPEN PLAN) , AND (D) EXTERNALLY LOCATED TEST TANK; (2) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE (A) INTERNAL ACCESS ROAD FROM THE EXISTING BIOGAS SITE, (B) CONCRETE RETENTION BUND, (C) 3 NO. DIGESTERS VESSELS WITH COLLECTION DOMES, (D) 3 NO. HYDROLYSIS TANK WITH COLLECTION COVERS, (E) PUMP HOUSES (2 NO.) AND ASSOCIATED PROCESS PIPEWORK, AND (F) STORMWATER ATTENUATION TANK, PETROL INTERCEPTOR AND ASSOCIATED PIPEWORK; (3) EXTENSION TO THE NORTHERN BOUNDARY OF THE BIOGAS PLANT TO ACCOMMODATE A FERTILISER PLANT, COMPRISING (A) FERTILISER PROCESSING BUILDING CONTAINING DIGESTATE PROCESSING EQUIPMENT, STORAGE AREAS AND ASSOCIATED, EXTERNALLY LOCATED, ODOUR CONTROL EQUIPMENT/EXHAUST STACK (17.5M IN HEIGHT), (B) LIQUID FERTILISER STORAGE TANKS (6 NO.), (C) HGV PARKING, (D) ALL PROCESS PIPEWORK AND ASSOCIATED DRAINAGE WORKS, AND (E) ASSOCIATED SITE WORKS INCLUDING FENCING AND LANDSCAPE SCREENING. THE PLANNING APPLICATION IS ACCOMPANIED BY AN ENVIRONMENTAL IMPACT ASSESSMENT REPORT (EIAR) AND A NATURA IMPACT STATEMENT (NIS) AND RELATES TO DEVELOPMENT WHICH COMPRISES AN ACTIVITY REQUIRING AN INDUSTRIAL EMISSIONS LICENCE FROM THE ENVIRIONMENTAL PROTECTION AGENCY (EPA) |
2050631 |
DEEMED WITHDRAWN |
PERMISSION |
|
24/05/2020 Sunday |
GLENMORE GENERATION LTD |
AGHAVEAGH BALLYBOFEY LIFFORD PO |
INSTALLATION OF THREE (3 NO.) PREFABRICATED DIGESTIVE PROCESSING / TEST TANKS AND ASSOCIATED PROCESS PIPEWORK WITHIN THE CURTILAGE OF THE EXISTING BIOGAS PLANT |