CONSTRUCTION OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER WITH ASSOCIATED SITE DEVELOPMENT WORKS IN PLACE OF THE ANAEROBIC DIGESTOR PREVIOUSLY GRANTED PERMISSION ON THE SITE REF. NO. PL 05.205313. THE DEVELOPMENT WILL PROVIDE FOR THE CHANGE OF USE OF AN EXISTING HAY SHED TO STORAGE AREA SEPARATOR, ERECTION OF A RECEPTION BUILDING, BUFFER TANKS, RECEPTION TANK, MIXING TANK, A DIGESTOR TANK AND SECONDARY DIGESTOR TANK WITH CO-JOINING PUMPROOM, A STORAGE TANK, BIOFILTER, CONDENSATE TRAP AND CHP UNIT.
Development Address:
CAVANAWEARY, CASTLEFIN, LIFFORD PO, CO. DONEGAL
Architect Name:
Location Key:
CAVANAWEARY
Electoral Division:
Urney West
Planner:
None
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Yes
Comments:
DURATION OF 08/60052 EXTENDED FROM 07.06.14 TO 07.06.19
Decision
Decision Date:
10/07/2014
Manager Order:
2014PH1038
Decision Type:
Number of Conditions:
0
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
05/09/2019
Decision Description:
CONSTRUCTION OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER WITH ASSOCIATED SITE DEVELOPMENT WORKS IN PLACE OF THE ANAEROBIC DIGESTOR PREVIOUSLY GRANTED PERMISSION ON THE SITE REF. NO. PL 05.205313. THE DEVELOPMENT WILL PROVIDE FOR THE CHANGE OF USE OF AN EXISTING HAY SHED TO STORAGE AREA SEPARATOR, ERECTION OF A RECEPTION BUILDING, BUFFER TANKS, RECEPTION TANK, MIXING TANK, A DIGESTOR TANK AND SECONDARY DIGESTOR TANK WITH CO-JOINING PUMPROOM, A STORAGE TANK, BIOFILTER, CONDENSATE TRAP AND CHP UNIT.
CONSTRUCTION OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER WITH ASSOCIATED SITE DEVELOPMENT WORKS IN PLACE OF THE ANAEROBIC DIGESTOR PREVIOUSLY GRANTED PERMISSION ON THE SITE REF. NO. PL 05.205313. THE DEVELOPMENT WILL PROVIDE FOR THE CHANGE OF USE OF AN EXISTING HAY SHED TO STORAGE AREA SEPARATOR, ERECTION OF A RECEPTION BUILDING, BUFFER TANKS, RECEPTION TANK, MIXING TANK, A DIGESTOR TANK AND SECONDARY DIGESTOR TANK WITH CO-JOINING PUMPROOM, A STORAGE TANK, BIOFILTER, CONDENSATE TRAP AND CHP UNIT.
DEVELOPMENT OF A COMMERCIAL CENTRALISED ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER INVOLVING THE DEMOLITION OF THE DWELLING AND ALL OUTBUILDINGS AND OTHER STRUCTURES WITHIN THE SITE, CONSTRUCTION OF FOUR PRIMARY DIGESTERS WITH COLLECTION DOMES, A CO-JOINING PUMP ROOM AND OTHER STRUCTURES ASSOCIATED WITH THE OPERATION OF AN ANAEROBIC DIGESTER SYSTEM INCLUDING THE FOLLOWING: TWO FEED HOPPERS, PRE PIT, CHP BUILDING, FLARE, GAS COMPRESSION & CO2 BUILDING,BIOGAS PURIFICATION & BOTTLING UNIT, RECEPTION TANK, MIXING TANK AND PASTEURISATION BUILDING. WORKS SHALL INCLUDE THE PROVISION OF A CONCRETE APRON, ALL DRAINAGE,ALL OTHER ASSOCIATED SITE WORKS, THE PROVISION OF A NEW ACCESS LANEWAY TO THE SITE FROM THE LOCAL ROAD AND THE WIDENING OF THE LOCAL ROAD ON BOTH SIDES OF THE PROPOSED ENTRANCE
CONSTRUCTION OF AN ANAEROBIC DIGESTER FOR THE PRODUCTION OF RENEWABLE ENERGY AND FERTILISER WITH ASSOCIATED SITE DEVELOPMENT WORKS IN PLACE OF THE ANAEROBIC DIGESTOR PREVIOUSLY GRANTED PERMISSION ON THE SITE REF. NO. PL 05.205313. THE DEVELOPMENT WILL PROVIDE FOR THE CHANGE OF USE OF AN EXISTING HAY SHED TO STORAGE AREA SEPARATOR, ERECTION OF A RECEPTION BUILDING, BUFFER TANKS, RECEPTION TANK, MIXING TANK, A DIGESTOR TANK AND SECONDARY DIGESTOR TANK WITH CO-JOINING PUMPROOM, A STORAGE TANK, BIOFILTER, CONDENSATE TRAP AND CHP UNIT.