(1) DEMOLITION OF EXISTING (DEFECTIVE / MICA) DWELLING HOUSE (2) CONSTRUCTION OF REPLACEMENT DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS INCLUDING MINOR ALTERATIONS TO THE ELEVATIONS AND CONSERVATORY OF THE EXISTING DWELLING, CONNECTION TO EXISTING SITE SERVICES (3) ERECTION OF A TEMPORARY STRUCTURE OF A MOBILE HOME FOR THE DURATION OF THE WORKS LOCATED ON THE WEST SOIDE OF THE SITE
(1) DEMOLITION OF EXISTING (DEFECTIVE / MICA) DWELLING HOUSE (2) CONSTRUCTION OF REPLACEMENT DWELLING HOUSE AND ALL ASSOCIATED SITE WORKS INCLUDING MINOR ALTERATIONS TO THE ELEVATIONS AND CONSERVATORY OF THE EXISTING DWELLING (3) CONNECTION TO EXISTING SITE SERVICES (4) ERECTION OF A TEMPORARY STRUCTURE OF A MOBILE HOME FOR THE DURATION OF THE WORKS LOCATED ON THE EAST SIDE OF THE SITE
No Environment Impact Assesments Associated with this Application