ERECTION OF 12 NO HOUSES AND 10 N0 DUPLEX UNITS (TOTAL NO OF LIVING UNITS=32).ALSO ALL ASSOCIATED SITE WORKS INCLUDING PRIMARY TREATMENT SYSTEM AND CONNECTION TO EXISTING FOUL SEWER
(1) CONSTRUCTION OF A COMMERCIAL BUILDING CONSISTING OF OFFICES AND REPAIR/ MAINTENANCE WORKSHOP FOR VEHICLES IN CONNECTION WITH LOGISTICS/ HAULAGE BUSINESS, (2) REDUCTION OF LAND LEVEL BY REDUCING SOILS LEVEL AND CONSTRUCTION OF A RETAINING WALL, (3) CONNECTION TO WATERMAINS, PUBLIC SEWER AND STORMWATER SYSTEMS ADJACENT TO THE PROPOSED SITE, (4) UPGRADING OF EXISTING ENTRANCE ONTO THE EXISTING INDUSTRIAL ESTATE ROAD ADJACENT TO THE SITE TO ALLOW FOR HAULAGE VEHICLES, INCLUSIVE OF 2.4M HIGH ELECTRIC GATES, (5) LAYING OF HARDCORE STONE AREA FOR TRUCK PARKING AND ALL ASSOCIATED SITE WORKS