Planning application details ref: 2460002 Clare County Council

90% Complete (warning)

Planning Application: 2460002 (Clare County Council )
File Number: 2460002
Application Type: PERMISSION Planning Status: NEW APPLICATION
Received Date: 03/01/2024 Decision Due Date: 24/10/2024
Validated Date: 03/01/2024 Invalidated Date:
Further Info Requested: 26/02/2024 Further Info Received: 16/08/2024
Withdrawn Date: Extend Date:
Decision Type: Decision Date:
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 03/10/2024

Applicant Details

Applicant name: Uisce Éireann
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: to apply for a 10-year permission for development at these sites (c.4.56ha combined total) in the townlands of Kilkee Lower and Foohagh, Kilkee, Co. Clare (no Eircode available); comprising two areas of land principally bound: Subject Site (A) to the north by residential dwellings at Victoria Park and Páirc na mBláth, to the south by agricultural land and residential dwellings at Victoria Park, to the east by Victoria Stream and residential dwellings at Victoria Park, and to the west by Haugh Mobile Park and residential dwellings at Páirc na mBláth (c.1.05a); Subject Site (B) to the north by agricultural land and the Dunlicky Road beyond, to the east by an un-named access road and agricultural land, to the south by agricultural land and a residential dwelling beyond, and to the west by agricultural land – this site also includes a section of the Dunlicky Road that is within the Foohagh Townland (c.3.51ha). The development will consist of: [1] The construction of a new Foul Pumping Station (PS) at Subject Site (A) comprising of: an emergency storage tank; surge kiosk; washwater kiosk; odour control building; control panel kiosk; standby generator; foul pumping station; petrol interceptor; potable water / break tank kiosk; gantry's for pump and cleaning system removal; installation of underground internal site pipework including surface water drainage and petrol interceptor; ESB building and Panel Room (c.36.2sq.m. GFA); 2.4m high wire mesh security boundary fence; replacement of existing chainlink fence; safety bollards; new signage; an access gate; temporary construction access including the demolition and reinstatement of a boundary wall at the existing Victoria PS site; temporary works area; permanent access off Victoria Park; and all hard and soft landscaping including screen planting. [2] The construction of a new Wastewater Treatment Plant (WwTP) at Subject Site (B) comprising of: 2 no. primary settlement tanks; MCC kiosk; outfall pumping station; picket fence thickener; return liquors pumping station; sludge / scum pumping station; odour control plinth; inlet works and grit chamber; potable water break tank booster set kiosk; storm holding tank; storm return pumping station; excess FFT chamber; FFT flow measurement chamber; PST flow splitting chamber; gantrys for pump and cleaning system removal; a control building (c.102.5sq.m. GFA); ESB building (c.36.2sq.m. GFA); standby generator and fuel tank; solar panels (c.250sq.m. area / c.3.5m high); installation of a CCTV system and task lighting; 2.4m high security mesh boundary fencing; 1.2m high stock proof perimeter fence; access gate; upgrading of the existing access lane and entrance from the Dunlicky Road (including the increasing of levels in the adjacent fields to match the existing lane levels to facilitate widening of lane from c.3m to c.4m wide); 3 no. site parking spaces; new signage; temporary works area; and all hard and soft landscaping including extensive earthworks to provided appropriate earthworks screening and screen planting. [3] The installation of new sewers comprising of: c.45m of new gravity sewer that will intercept the flows into the existing Victoria PS and transfer these flows to the new Kilkee Foul PS; c.85m storm overflow pipe to Victoria Stream from Kilkee Foul PS; connecting pipework from existing network to new Foul PS, connecting pipework to existing rising mains and all associated interconnecting pipework; providing overflow to Victoria Stream and associated new headwall, and new treated effluent rising mains; and c.1,050m of new rising main for the final effluent from the Kilkee WwTP to the existing Outfall manhole within the Foohagh Townland. [4] All other associated site excavation, infrastructural and development works above and below ground. A Natura Impact Statement has been prepared in respect of the proposed development
Development Address: sites in the townlands of Kilkee Lower and Foohagh, Kilkee, Co. Clare
Architect Name: Location Key: KILKEE
Electoral Division: Planner: John O Sullivan
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments: FI received is deemed a full response and significant.

Decision

Decision Date: Manager Order:
Decision Type:
Grant Date: Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date:
Decision Description:

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: