Planning Application: 22662 (Tipperary County Council )
File Number:
22662
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
06/12/2022
Decision Due Date:
08/02/2023
Validated Date:
06/12/2022
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
07/02/2023
Leave to Appeal:
Appeal Date:
06/03/2023
Commenced Date:
Submissions By:
18/01/2023
Applicant Details
Applicant name:
Soleire Renewables SPV Alpha 2 Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
amendment to the design of the previously approved development (Planning Reference: Tipperary County Council 21261), which comprises consent for a 10 year period to construct and a 40 year period to operate a 142.7 hectare Solar PV Energy Development to include (1) slight increase in the height of the Solar PV panels, (2) slight increase in the bottom height of the Solar PV panels off the ground, (3) slight reduction in the spacing of Solar PV rows (strings), (4) slight decrease in size of solar panels, (5) slight increase in the area of transformers/inverters as a result of slight change in dimensions and (6) an increase in the number of solar panels (A Natura Impact Statement will also be submitted)
Development Address:
Monaincha Townland, Roscrea, Co Tipperary
Architect Name:
Kieran Tarpey
Location Key:
MONAINCHA, ROSCREA
Electoral Division:
Planner:
MARION CAREY
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
07/02/2023
Manager Order:
Decision Type:
Conditional
Number of Conditions:
3
Grant Date:
Grant Managers Order #:
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
22/01/2029
Decision Description:
amendment to the design of the previously approved development (Planning Reference: Tipperary County Council 21261), which comprises consent for a 10 year period to construct and a 40 year period to operate a 142.7 hectare Solar PV Energy Development to include (1) slight increase in the height of the Solar PV panels, (2) slight increase in the bottom height of the Solar PV panels off the ground, (3) slight reduction in the spacing of Solar PV rows (strings), (4) slight decrease in size of solar panels, (5) slight increase in the area of transformers/inverters as a result of slight change in dimensions and (6) an increase in the number of solar panels (A Natura Impact Statement will also be submitted)
Construct a windfarm to consist of (a) 10 wind turbine generators of hub height 80m; (b) a 50m anemometer mast; (c) electrical substation and switch station; (d) proprietary treatment unit and raised irrigation area; (e) access tracks and buried cable ducts; (f) associated site works. E.I.S. submitted with application.
windfarm development which has been the subject of a successful previous planning application reference 03510957. This application seeks a ten year permission for the previously permitted development and will consist of: (a) 10 no. wind turbine generators of hub height 80m; (b) Electrical substation & switch station; (c) Proprietary treatment unit & waste water holding tank; (d) Access tracks & buried cable ducts; (e) All associated site works & miscellaneous landscaping & enabling works. It should be noted that an Environmental Impact Statement is submited with this application
amendment of the design of the previously approved development (reference 21261) which comprises consent for a 10 year period to construct and a 40 year period to operate a 142.7 hectare Solar PV Energy Development; amendment includes 1) slight increased in the height of the Solar PV panels, 2) slight increase in the bottom height of the Solar PV panels off the ground, 3) slight reduction in the spacing of Solar PV rows (strings), 4) slight decrease in size of solar panels, 5) slight increase in the area of transformers/inverters as a result of slight change in dimensions and 6) an increase in the number of solar panels - A Natura Impact Statement will also be submitted
The Sheehy and Monaincha Townlands Roscrea Co. Tipperary
the construction of a 4.00m wide access track, including crossing of the Rackethall Stream and other stream (unnamed), measuring approximately c.750m in overall length to facilitate access between two consented solar farms, those being Monaincha Solar Farm (Ref. 21261) and The Sheehy’s Solar Farm (Ref. 16/600917). The access track would be located (Grid Easting: 618575; Northing 686630 centre of application site. A Natura Impact Statement is submitted as part of the planning application