(1) revision of existing site boundary with an overall increase in site area of 0.48HA to that granted under PL 15/267 (2) construction of an extension to the existing production area (to provide warehouse storage to ground floor only) & office areas on ground and first floor (3) construction of a ground floor canteen to include storage, prep & wash areas with an external waste storage area (single storey) to proposed western gable (4) construction of a fire sprinkler storage tank & intergrated pump house, electrical switch room, electrical meter room to serve the existing & proposed facility (5) construction of an additional car park area adjacent to the northern boundary (6) provision of external mechanical & electrical plant equipment to the northern & western elevations of the proposed extension to facilitate site services (7) provision of a second site entrance to loading docks/warehouse area with access from the western site boundary (8) carrying out of all associated site development works deemed necessary as part of the works
Development Address:
Finisklin Business & Technology Park, Finisklin, Sligo
Architect Name:
Ronan Tansey
Location Key:
FINISKLIN
Electoral Division:
Planner:
06
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Commencement Notice validated on Building Control Management System (B.C.M.S.).
Decision
Decision Date:
27/07/2017
Manager Order:
P344/17
Decision Type:
Conditional
Number of Conditions:
5
Grant Date:
27/08/2017
Grant Managers Order #:
P344/17
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
26/08/2022
Decision Description:
(1) revision of existing site boundary with an overall increase in site area of 0.48HA to that granted under PL 15/267 (2) construction of an extension to the existing production area (to provide warehouse storage to ground floor only) & office areas on ground and first floor (3) construction of a ground floor canteen to include storage, prep & wash areas with an external waste storage area (single storey) to proposed western gable (4) construction of a fire sprinkler storage tank & intergrated pump house, electrical switch room, electrical meter room to serve the existing & proposed facility (5) construction of an additional car park area adjacent to the northern boundary (6) provision of external mechanical & electrical plant equipment to the northern & western elevations of the proposed extension to facilitate site services (7) provision of a second site entrance to loading docks/warehouse area with access from the western site boundary (8) carrying out of all associated site development works deemed necessary as part of the works
Finisklin Business & Technology Park Finisklin Sligo
Development consisting of 1. Revision of the western site boundary to that previously granted under PL17/221 with an overall increase in site area of 0.53HA 2. Erection of a prefabricated solvent storage shed adjacent to the northern site boundary 3. construction of 2Nr concrete bases and 2Nr waste compactor units to the western elevation of the new extension under construction 4. Carrying out all associated site development works deemed necessary as part of these works
Development consisting of a new Advanced Office Building. Permission is sought for signage, new timber post-and-rail site boundaries, car parking, cycle shelter, bin store, landscaping, gas tanks, underground water storage tank, underground pumping station, ESB substation/switch room and all associated site works. The development has been the subject of Screening for Appropriate Assessment and Natura Impact Assessment in accordance with XAB of the Planning and Development Act 2000 (as amended) and under Regulation 42 of the Birds and Natural Habitats Regulations 2011 (as amended).
IDA Ireland Business & Technology Park Finisklin Sligo
Development consisting of a new Advance Office Building. Permission is sought for signage, new timber post-and-rail site boundaries, car parking, cycle shelter, bin store, landscaping, gas tanks, underground water storage tank, underground pumping station, ESB substation/switch room and all associated site works. A Natura Impact Assessment has been submitted to the Planning Authority with the Planning Application.
No Environment Impact Assesments Associated with this Application