development consisting of: (1) erection of an extension to dwelling house and conversion of the attic to bedroom use (2) retention of the upgrade of the waste water treatment system and the installation of a Biocycle proprietary treatment unit and percolation area and (3) retention of the storage shed constructed at the rear of the dwelling house
Development Address:
Clover Cottage, Doonfore, Ballinfull, Co. Sligo
Architect Name:
Location Key:
DOONFORE
Electoral Division:
Planner:
03
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Commencement Notice validated on Building Control Management System (B.C.M.S.).
Decision
Decision Date:
21/07/2017
Manager Order:
P334/17
Decision Type:
Conditional
Number of Conditions:
7
Grant Date:
21/08/2017
Grant Managers Order #:
P334/17
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
20/08/2022
Decision Description:
development consisting of: (1) erection of an extension to dwelling house and conversion of the attic to bedroom use (2) retention of the upgrade of the waste water treatment system and the installation of a Biocycle proprietary treatment unit and percolation area and (3) retention of the storage shed constructed at the rear of the dwelling house
development consisting of: (1) erection of extension to dwelling house and conversion of the attic to bedroom use (2) upgrading of the existing septic tank system by installing a proprietary treatment unit and percolation area (3) retention of a storage shed built at the rear of the dwelling house
No Environment Impact Assesments Associated with this Application