Planning Application: 2360142 (Roscommon County Council )
File Number:
2360142
Application Type:
PERMISSION
Planning Status:
APPEALED
Received Date:
29/09/2023
Decision Due Date:
06/05/2024
Validated Date:
29/09/2023
Invalidated Date:
Further Info Requested:
23/11/2023
Further Info Received:
12/03/2024
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
03/05/2024
Leave to Appeal:
Appeal Date:
27/05/2024
Commenced Date:
Submissions By:
15/04/2024
Applicant Details
Applicant name:
Natural Forces Renewable Energy Ltd.
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
Permission for a development relating to the: • The construction of one Enercon E138 Wind Turbine on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m • Installation of the hardstanding area for the Wind Turbine. • Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. • Construction of the proposed substation
building which will be located c.282m from the proposed wind turbine and surrounded by stock proof fencing. It will be a single storey building, measuring 55m 2 and c.5m in height; • Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. • All associated ancillary infrastructure and preparatory works such as provision of the site entrance The power rating associated with the proposed wind turbine will be 4.2 megawatts (MW). The proposed Project will have a 30-year lifespan. A Natura Impact Statement has been prepared as part of this planning application at
Permission for a development relating to the: • The construction of one Enercon E138 Wind Turbine on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m • Installation of the hardstanding area for the Wind Turbine. • Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site. • Construction of the proposed substation
building which will be located c.282m from the proposed wind turbine and surrounded by stock proof fencing. It will be a single storey building, measuring 55m 2 and c.5m in height; • Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area. • All associated ancillary infrastructure and preparatory works such as provision of the site entrance The power rating associated with the proposed wind turbine will be 4.2 megawatts (MW). The proposed Project will have a 30-year lifespan. A Natura Impact Statement has been prepared as part of this planning application at
Permission for: The construction of one 4.2 MW wind turbine with overall tip height of up to 150m; The construction of the wind turbine foundation, hard standing and assembly area; Provision of a site entrance and an access track within the site; Construction of an on-site 20kV substation and underground electrical cable; All associated site development and ancillary works (a Natura Impact Statement (NIS) has been submitted in respect of this application at the request of the Planning Authority) at
Permission for development relating to the:
•The construction of one Enercon E138 Wind Turbine on an 81m tower with an electrical rating of 4.2MW and an overall tip height of 149.38m.
•Installation of the hardstanding area for the Wind Turbine.
•Installation of underground circuit cables which will run in underground cable trenches (c.1.2m deep), from the proposed Wind Energy Converter to the proposed substation building on the site.
•Construction of the proposed substation building which will be located c.282m from the proposed wind turbine and surrounded by stock proof fencing. It will be a single storey building, measuring 55m2 and c.5m in height;
•Construction of proposed internal site access track, constructed from permeable material and which will run from the site entrance to the Wind Energy Converter hardstanding area.
•All associated ancillary infrastructure and preparatory works such as provision of the site entrance
The power rating associated with the proposed wind turbine will be 4.2 megawatts (MW). The proposed Project will have a 30-year lifespan. A Natura Impact Statement has been prepared as part of this planning application at
No Environment Impact Assesments Associated with this Application