the development will consist of: (i) The construction of a new two-storey extension consisting of 11 no. General Classrooms, 2 no. science rooms, 1 no. Home Economics Room, 2 no. SET rooms, Fitness suite & associated spaces. New extension to be linked to the existing school on both floors with some internal revision required. Existing ballcourts with enclosing fencing to be revised to suit new extension location. (Total New Area = 2213m²). (ii) The construction of a new standalone Technical Building to include a Technology Room & a Construction Studies Room with prep room. (Total New Area = 362m²). (iii) A new services & staff vehicular entrance gate with access road to a new carparking area (36 spaces) with site lighting and 2 additional disabled spaces within the existing service yard. (iv) A new all-weather pitch to the east of the site (New area 1103m²), with enclosing 2.4m high fencing and floodlighting. (v) New covered bicycle spaces (120 No.) to front of school in addition to the existing 80 bike spaces. (vi) Including all associated site & landscaping works. (vii) An AA Screening report has been completed as part of this application
Development Address:
Colaiste na hInse, Coast Road, Bettystown, Co Meath A92NY30
construction of a new two storey post primary school with general classsrooms; special needs unit; specialist rooms ; support teaching spaces; administration areas and ancillary accommodation with a total combined floor area of c.9436m2. The site works to the school grounds will consist of the provision of 85no. car parking spaces, drop-off and pick-up facilities; bicycle parking, 6no. ball courts, service yard; external store; bin stores, associated landscaping and boundary treatments and all ancillary site works. The works will be completed on a phased basis. The existing temporary school ( planning ref:sa/801685) will be decommissioned during phase 2 of the works. Significant Further information / Revised plans submitted on this applicaiton.
the construction of Colaiste na hInse Post Primary School temporary accommodation for 3 years consisting of a part 2 storey part single storey temporary building of total area 1,772 sqm, comprising 12 general classrooms, science lab, home economics room, art and crafts room, computer room, construction studies room and ancillary accommodation. The temporary school will be constructed on a phased basis over 2 years commencing in year one with all accommodation excluding 3 no general classrooms. The additional 3 general classrooms being added in year 2. The works also include the provision for connection into the public sewers adjacent, the provision of a single storey ESB substation to supply power to the development, 36 no car parking spaces, 2 no external ball courts, bicycle spaces and all other associated site works. The car parking shall access off the existing site road leading to Scoil Oilibheir Naofa which is connected to the existing Laytown Road, with a setdown area outside the main gates of proposed temporary accommodation
No Environment Impact Assesments Associated with this Application