SH314550 |
APPLICATION FINALISED |
PERMISSION |
C |
07/09/2022 Wednesday |
Arnub Ltd. & Aspect Homes (ADC) Ltd. |
Baltrasna and Milltown Ashbourne County Meath |
*STRATEGIC HOUSING DEVELOPMENT, SUBMISSIONS DIRECTLY TO AN BORD PLEANALA*, on an overall site of c. 20.04 hectares, located in the townlands of Baltrasna and Milltown, Ashbourne, County Meath. The application site is located to the west / south-west of Dublin Road (R135), south-west of Cherry Lane, west of the existing dwellings at The Briars and Cherry Court, south of the existing dwellings at Alderbrook Heath, Alderbrook Downs & Alderbrook Rise, east / south-east of the existing dwellings at Tara Close & Tara Place, and north-west and south-west of Hickey’s Lane.
The development will consist of the following:
(1) Demolition of all existing structures on site, comprising 3 no. single storey dwellings and their associated outbuildings (total demolition area: c.659m²).
(2) Construction of 702 no. residential dwellings comprised of: 420 no. 2 & 3 storey 2, 3, 4, & 5 bed detached, semi-detached & terraced houses, 38 no. 2 & 3 bed duplex units in 19 no. 3 storey buildings, and 244 no. 1, 2, & 3 bed apartments in 20 no. buildings ranging in height from 3 to 6 storeys.
(3) The development also includes for the following non-residential uses: (i) 2 no. childcare facilities located in Blocks A and A1 (c. 289m² & c.384m² respectively), (ii) 4 no. retail units comprised of: 2 no. units in Block A (c.106m² & c.174m² respectively), 1 no. unit in Block A1 (c.191m²), & 1 no. unit in Block B1 (c.469m²), and (iii) 1 no. GP practice / medical use unit located in Block A1 (c.186m²).
(4) The development provides for a basement level car park located under Block A1 (c. 4,095m2) and, 2 no. undercroft car parks located at the ground floor level of Block A (c. 466m2) and Block B1 (c. 1,466m2).
(5) The development provides for an area of c.1 hectare reserved for a future school site and playing pitch at the western boundary of the site.
(6) Vehicular access to the development will be via 2 no. access points as follows: (i) from Cherry Lane, located off Dublin Road (R135), in the north-east of the site and, (ii) from Hickey’s Lane, located off Dublin Road (R135), to the east of the site. The development includes for road upgrades / improvement works to both Cherry Lane and Hickey’s Lane and their junctions with Dublin Road (R135). A new east-west access road through the development site extending from Cherry Lane to the western boundary of the site and all associated site development works is proposed. |