the development will consist of the following: 1. New LED light fittings to 4no. existing poles at 12metres high on south side of juvenile pitch. 2. New 4no. 12metre high poles with LED light fittings on north side of juvenile pitch. 3. Retention of 12metre high ball stop nets to east and west side of juvenile pitch 4. All associated site works
the development will consist of the following: 1. New LED light fittings to 4no. existing poles at 12metres high on south side of juvenile pitch. 2. New 4no. 12metre high poles with LED light fittings on north side of juvenile pitch. 3. Retention of 12metre high ball stop nets to east and west side of juvenile pitch 4. All associated site works
the construction of new extension to south side of existing multi-purpose room and provision of additional parking along with all associated site works. Significant further information/revised plans submitted on this application
development will consist of the following: 1. Existing all weather pitch surface to be upgraded to new 4g surface located in the north of the grounds. 2. Existing light fittings to 8no. floodlighting poles (at main pitches) to be upgraded to new LED light fittings along with all associated site works
EXTENSION OF DURATION OF PLANNING PERMISSION SA/130986 - Phase 1: Construction of a new entrance area to front existing clubhouse and construction of second storey extenstion over part of existing clubhouse, along with new polishing filter. Phase 2: Construction of remaining second storey extension over existing clubhouse. Phase 3: Construction of new viewing terrace and canopy to pitch side of existing clubhouse. All ancillary site work
minor changes to the clubhouse design, including revisions to elevations & interior layout, as per previously granted permission (Ref. SA130986) & extension of duration (Ref: LB181215).
No Environment Impact Assesments Associated with this Application