Planning application details ref: 2460669 Meath CoCo

100%100% Complete (warning)

Planning Application: 2460669 (Meath CoCo)
File Number: 2460669
Application Type: PERMISSION Planning Status: APPLICATION FINALISED
Received Date: 23/08/2024 Decision Due Date: 17/10/2024
Validated Date: 23/08/2024 Invalidated Date:
Further Info Requested: Further Info Received:
Withdrawn Date: Extend Date:
Decision Type: Conditional Decision Date: 10/10/2024
Leave to Appeal: Appeal Date:
Commenced Date: Submissions By: 26/09/2024

Applicant Details

Applicant name: Renewable Energy Systems Limited (RES Ltd)
Applicant Address:
Phone Number: Fax Number:
Corresp. Address:

Applicant Details


Proposed Development

Development Description: construction of an electricity storage facility comprising a Battery Energy Storage System (BESS) with an installed capacity of up to 50MW, within a total site area of up to 6.9ha, to include one electrical compound, electrical transformer/inverter station modules, 64no. battery storage enclosures (BSEs), 8no. power conversion systems on concrete support structures, attenuation pond of 1212 cubic metres, indicative 110kV buried import/export cable and indicative 110kV substation to facilitate connection to the existing 110kV Meath Hill substation, upgraded access tracks, crane hardstanding, associated electrical ducting, palisade security fencing and CCTV system, landscaping works, lighting poles and all other ancillary and miscellaneous site works including site clearance
Development Address: Meath Hill and Ardagh, between the settlements of Kingscourt and Drumconrath, Co. Meath
Architect Name: Catriona Morgan Location Key: MEATH HILL
Electoral Division: Incorrect Icl Voter Recor Planner: Donal Farrelly
Social Housing Exempt: Plan Enforcement #:
IPC Licence Required: No Waste Licence Required: No
Protected Structure: No Protected Structure #:
Development Name:

Proposed Development


Comments

Significant Case Flag: Comments:

Decision

Decision Date: 10/10/2024 Manager Order: 1402/24
Decision Type: Conditional Number of Conditions: 16
Grant Date: 26/11/2024 Grant Managers Order #:
Section 47 Apply?: Part 5 Apply?:
Expiry Date: 25/11/2029
Decision Description: construction of an electricity storage facility comprising a Battery Energy Storage System (BESS) with an installed capacity of up to 50MW, within a total site area of up to 6.9ha, to include one electrical compound, electrical transformer/inverter station modules, 64no. battery storage enclosures (BSEs), 8no. power conversion systems on concrete support structures, attenuation pond of 1212 cubic metres, indicative 110kV buried import/export cable and indicative 110kV substation to facilitate connection to the existing 110kV Meath Hill substation, upgraded access tracks, crane hardstanding, associated electrical ducting, palisade security fencing and CCTV system, landscaping works, lighting poles and all other ancillary and miscellaneous site works including site clearance

Appeal Details


Appeal Details
Notification Date: BP Reference #:
Appeal Type: File Forward Date:
Submission Due Date: Submission Sent Date:
Appeal Decision: Decision Date:
Withdrawn Date: Dismissed Date:
Reason: