Planning Application: 2461046 (Kildare County Council )
File Number:
2461046
Application Type:
PERMISSION
Planning Status:
APPLICATION FINALISED
Received Date:
11/10/2024
Decision Due Date:
05/12/2024
Validated Date:
11/10/2024
Invalidated Date:
Further Info Requested:
Further Info Received:
Withdrawn Date:
Extend Date:
Decision Type:
Conditional
Decision Date:
05/12/2024
Leave to Appeal:
Appeal Date:
Commenced Date:
Submissions By:
14/11/2024
Applicant Details
Applicant name:
AGB Landfill Holdings Limited
Applicant Address:
Phone Number:
Fax Number:
Corresp.
Address:
Applicant Details
Proposed Development
Development Description:
for a solar farm to be installed over restored landfill with an export capacity of approximately 4.5MW comprising photovoltaic panels on concrete ballast supported frames, construction of and connection to a new single-storey ESB Sub-Station / Switch Room building, installation of 3 No. transformers, ducting & electrical cabling and all associated ancillary works and services
Development Address:
Brownstown, Kilcullen, Co Kildare.
Architect Name:
Location Key:
Kilcullen
Electoral Division:
Planner:
Louise Murphy
Social Housing Exempt:
Plan Enforcement #:
IPC
Licence Required:
No
Waste Licence Required:
No
Protected Structure:
No
Protected Structure #:
Development Name:
Proposed Development
Comments
Significant Case Flag:
Comments:
Decision
Decision Date:
05/12/2024
Manager Order:
DO56177
Decision Type:
Conditional
Number of Conditions:
22
Grant Date:
28/01/2025
Grant Managers Order #:
DO56177
Section 47
Apply?:
Part 5
Apply?:
Expiry Date:
27/01/2030
Decision Description:
for a solar farm to be installed over restored landfill with an export capacity of approximately 4.5MW comprising photovoltaic panels on concrete ballast supported frames, construction of and connection to a new single-storey ESB Sub-Station / Switch Room building, installation of 3 No. transformers, ducting & electrical cabling and all associated ancillary works and services
the development of a Landfill Gas Utilisation Plant. The proposed plant will generate an estimated 2.5-3.5 MW of electricity for input into the national grid for a period of up to 25 years. The plant will be located on a ca. 1400m2 site etc.
A solar farm to be installed over restored landfill with an export capacity of approximately 3MW comprising photovoltaic panels on ground mounted frames, connection to existing single-storey ESB Sub- Station / switch room building, installation of 3 No. transformers, ducting and underground electrical cabling and all associated ancillary works and services. Revised by significant further information consisting of; construction management plan detailing construction techniques
(1) demolish existing dwellinghouse (2) extend an existing sand and gravel pit by 2 ha (3) continue extraction of sand and gravel beyond May 1999 as already granted under permission ref 1324/95 (4) continue placing existing plant on site and ETC
No Environment Impact Assesments Associated with this Application