File No |
Staus |
Type |
Decision |
Received Date |
Name |
Development Address |
Description |
011064 |
DECISION MADE |
PERMISSION |
C |
13/06/2001 Wednesday |
Ballyfarm Ltd. |
Great Connell Newbridge Co. Kildare |
sought for 4 light industrial / warehouse buildings consisting of 3 detached buildings, units 1, 2 & 3 with gross ground floor area of 9451sq.m, 1656sq.m & 2026sq.m respectively & 1 cluster building etc. |
03679 |
APPLICATION FINALISED |
PERMISSION |
C |
15/04/2003 Tuesday |
Ballyfarms Ltd |
Great Connell Newbridge |
sought for (a)two storey office extension to front of previously granted metal fabrication and plant repair workshop (Pl.Ref.no 97/1450) that is currently under construction (b) new single storey ESB sub-station to rear and side of metal fabrication |
081743 |
APPLICATION FINALISED |
RETENTION |
C |
09/10/2008 Thursday |
Ballyfarm Limited |
Great Connell Newbridge Co Kildare |
(a) change of use from stable yard to plant storage compound (area of 2371.60m2) and (b)Change of use from 3no. bloodstock type buildings (area of 387.1m2) to plant storage buildings and (c) Change of use from agricultural paddock to overflow etc |
09169 |
APPLICATION FINALISED |
PERMISSION |
C |
19/02/2009 Thursday |
Ballyfarm Limited |
Great Connel Newbridge Co.Kildare |
new 2 storey offices to front of existing fabrication and plant repair workshop and assocaited site development works including landscaping and additonal car parking spacec (38 no). This application is identical to and a renewal of , the previous planning permission grantd which had now expired ( panning register reference no 03/679). |
1620 |
APPEALED FINANCIAL |
PERMISSION |
C |
14/01/2016 Thursday |
Ballyfarm Limited |
Greatconnell Newbridge Co. Kildare. |
(a) The demolition of an existing store building with an area of 484.0sqm; (b) The construction of a new stores building with an area of 436.6sqm, and an overall height of 9.266m. Accommodation to include: open storage area for general storage of building materials and spare parts, wc, welding rod store, paint store, office, tool store and PPE lock up; and (c) All associated site development works |
211780 |
APPLICATION FINALISED |
PERMISSION |
C |
17/12/2021 Friday |
Murphy International Limited, |
Great Connell, Newbridge, Co. Kildare. |
works to the existing Murphy International Limited Headquarters to accommodate two new industrial buildings, comprising a Steel Fabrication building and a Pipe Ancillary building, and associated development and works. The Steel Fabrication Building of 2,495 sqm is 13.1 metres in height and accommodates a fabrication area of 2,229 sqm and a staff welfare area of 133 sqm at ground floor level, and an ancillary office of 133 sqm at first floor level. The Pipe Ancillary Building of 760 sqm is single storey and 9.3 metres in height, and will accommodate workshops. Solar photovoltaic panels are proposed on the roofs of both buildings. It is proposed to demolish 4 No. existing buildings including an Office (300sqm), Lean-to Warehouse (240 sqm), Warehouse (415 sqm), and a Storage Barn (112 sqm), and to demolish the existing boundary walls on Great Connell Road and on part of the existing access road. It is proposed to upgrade the existing access road to provide a 7.5 metre carriageway, 1.5 metre grass verge, 2 metre cycle lane, 2 metre footpaths, tree planting and a 2.5 metre boundary wall to the subject site, and to upgrade the boundary on Great Connell Road by removing the existing entrances and providing a 1.5 metre grass verge, 2 metre cycle lane, 2 metre foot path, tree planting and a 2.5 metre acoustic timber fence. It is proposed to provide 84 No. car parking spaces and 33 No. bike parking spaces, 3 No. signs of 5.2 sqm each are proposed; 1 No. on the southwest elevation of the Steel Fabrication Building, 1 No. on the northeast elevation of the Pipe Ancillary Building, and 1 No. on the northwest elevation of the Pipe Ancillary Building. The existing yard will be extended by 0.9 ha. These and all ancillary works including the regrading of an existing drainage ditch, all water infrastructure, internal roads, and landscaping are proposed on a site of 4.7 ha. |
2360087 |
APPLICATION FINALISED |
PERMISSION |
C |
02/08/2023 Wednesday |
Murphy International Limited |
Great Connell Newbridge Co. Kildare |
(a) The construction of new 2-storey extensions to the south-west (extension 1—proposed floor area of 81.9 m2) and north-east (extension 2—proposed floor area of 106.6 m2) ends of the existing 2-storey offices to the rear of the existing fabrication workshop to provide additional office and ancillary accommodation.
(b) The construction of an internal pedestrian walkway link at first floor level (proposed floor area of 45.8 m2) within the existing fabrication workshop to connect the existing offices to the rear to the existing offices to the front that face the Newbridge South Orbital Relief Road (NSORR).
(c) Modifications to the existing fabrication workshop & rear offices to include:
• Replacement of all existing external windows & doors in the existing rear offices with new windows & doors.
• Widening of some existing window openings in the existing rear offices to facilitate larger window openings.
• Replacement of existing external wall finishes of the existing rear offices—forticrete blockwork at ground floor level and profiled metal cladding at first floor level—with new insulated cladding panels.
• Amendments to the north-east elevation of the existing fabrication workshop to include new insulated cladding panels and new windows and doors.
• Internal modifications to the existing rear offices and fabrication workshop to facilitate the proposed extension works and connection of the proposed internal pedestrian walkway link between the front and rear offices.
(d) The provision of 5 additional car parking spaces to serve the proposed extension works.
(e) The provision of 5 additional bicycle parking spaces to serve the proposed extension works.
(f) The connection to existing services on site—i.e. connection into existing foul, surface water, & water main networks serving the existing building.
(g) All associated ancillary site development works. Please note all other planning items relating to the overall Murphy International headquarters and site are to be completed as per details agreed under previously approved planning permission register reference no.: 21/1780. Development works agreed under this previous grant of permission are ongoing. |
78991 |
DECISION MADE |
PERMISSION |
C |
01/01/1978 Sunday |
|
Great Connell Newbridge
|
Erection Of Workshop |
791244 |
DECISION MADE |
PERMISSION |
C |
01/01/1979 Monday |
|
Great Connell Newbridge
|
Erection Of A 50 Ton Cement Storage Silo |
821052 |
DECISION MADE |
PERMISSION |
C |
01/01/1982 Friday |
|
Great Connell Newbridge Co. Kildare |
Retain Existing Store, Change Of Use Of Store To Workshop And For Proposed Concrete Batching Plant And Steel Bar Bending Building |
971450 |
APPLICATION FINALISED |
PERMISSION |
C |
19/11/1997 Wednesday |
Bally Farm Ltd |
Great Connell, Newbridge . |
(a) demolition of existing piling shed (b) erection of new piling shed & relocation of same (c) erection of metal fabrication and plant repair workshop and offices at first floor level (d) retention of extension to existing store together with, ETC |